Laserfiche WebLink
r <br /> CL088D CIi 110R1C ORDERS AEpORT <br /> Total Utility Maintenance Management System <br /> O1/27/1997 Page 1 <br /> _____�_�__�-------------- <br /> --------------�________---------_------------- <br /> -----�___ __________'__eo=eveeeceevvev�aevesva <br /> Date Ranqe :01/09/1989 - O1/07/1997 <br /> CM Work Order Range : 1001091070001 - UT2600-02- Pattern :7101096750257 <br /> Item Ranqe :<Hlank> - WW22020001 Pattern :* <br /> Program ALL Function ALL Activity ALL <br /> ee=aavnavm�evaaevvsaavemvaavvavr- ..arsvaavveveemavoasevvQaeeeesavammavaas�saaaaaa <br /> CM WORK ORDER ID: 71010967502ti7 �itle: REPAIR 2202 - CHESTNUT ST�y! <br /> «DUPLICATE PRINTING OF THIS WOkn �RDER» <br /> Item ID: SS2095N026 -- SEWER SERVI�E <br /> LoCdtion ID: -- <br /> Proqram 710 Function 109 Activity 675 <br /> Date Completed: O1/07/1997 <br /> Overall Craft: <br /> Iasued: 12/23/1996 Issued by: HDA Asaigned to: AGA <br /> Out of Sarvice? NO Priority: Travel Time: 0.00 Hr. <br /> Meter Reading: <br /> Downtime: 0 hours <br /> Status: HN <br /> Labor: <br /> Craft ID Name Planned Hrs Actual Hrs Cost <br /> ----- ------ ------------------------------ ----------- ---------- ---------- <br /> UL GDJ GOSS, DANNY JAMES 0. 00 2 . 00 26.96 <br /> DL HJT HOUSTON, JOSHUA T. 0.00 8. 00 64.00 <br /> HEO MCC MAGEE, CARL C. 0. 00 8. 00 164. 16 <br /> UL NCR NIETHAMER, CHARLES R. 0.00 8. 00 124.64 <br /> HEO ODJ O'LEARY, BRIAN J. Q. 00 2. 00 34.78 <br /> HEO SDD STECHER, DANIEL D. 0. 00 8 .00 162.96 <br /> UL WTE WESTVANG, TERRY E. 0.00 8. 00 126.24 <br /> Total Labor Cost: 703.74 <br /> Materialas <br /> ID Description Date # Used Cost <br /> ------- ------------------------------ -------- -------- ---------- <br /> CEME00061438 CEMENT 20 MIN. SET 50 LB. BAG O1/07/1997 1 11.86 <br /> COUP44300147 COUPLING 6" CONC X 6" CIjPL O1/07/1997 2 12.78 <br /> ELLA44303447 ELL 6�� 45 DEG SP X GASKETED O1/07/1997 2 g,qg <br /> ELL044307647 ELL 6" 22 1/2 DEG SP X GASKET O1/07/1997 2 9.52 <br /> PIPE44304247 PIPE 6" PVC SEWER O1/07/1997 13 16.25 <br /> PIPE44304247 PIPE 6" PVC SEWER O1/07/1997 8 10.00 <br /> PLUG44307747 PLUG 6" (PVC) SEWER BELL END O1/07/1997 1 2.02 � -°. <br /> WYE044303947 WYE 6" ALL GASKETED O1/07/1997 1 10. 63 <br /> WYE044303947 WYE 6" ALL GASKETED O1/07/1997 1 10.63 <br /> Total Material Cost: 93.17 <br /> V�Aial�st <br /> ID Description Hours Cost <br /> --------•---- ------------------------------ ------ ---------- <br /> V2113 91 CHEV 1-TON 2. 00 10. 60 <br /> V2152 87 DODGE W/HOIST 8. 00 38.40 <br /> V2663 87 VACTOR 2. 00 95.40 <br />