Laserfiche WebLink
( C . <br /> PUBLIC WORKS PERMIT COMMENTS <br /> 4. Connect side sewer per City Standard tf601. <br /> 5. Connect side sewer per City Standard#'s 601, 602,604. <br /> � Connect all rooftop downspouts to the side sewer. <br /> 7. Connecl rooftop downspouts to the drainage system provided for this lot. <br /> 8. Rooftop runoff must be discharged to a roof downspout Infillration system per City of Everett Storm <br /> Manual 3-2.6.2. The approximate size trench Is 3.5'wide,2'deep end 25'long. See attachment for <br /> more details. <br /> 9. The contractor must meet with Ihe Public Works Inspector lo discuss potential drafnage routing prior to <br /> beginning the pro)ect. <br /> 10. Inslall erosion control measures as determined by the Public Works Inspector, such as silt fence, straw <br /> bales, swales,or erosion blankets. <br /> 11. Install eraslon conirol measures per City of Everett Standards for small percels <br /> 12. Remove erosion control measures upon completion of lhe proJect prior lo final approval of the permit. <br />, 13. All excavated malerial from foundatlon, sidewalk end driveways shall be hauled lo an approved, <br /> pertnitted s(te. No wasting of ineterial Is alloweo on lhls buildfng lol. <br /> 14. No dirt, mud, rocks or debris to be trecked onto roadway. <br /> 15. No building materials to be stacked on sidewalks and sidewalks to be kept clean and open for <br /> pedestrian travel. <br /> 16. AdJust water meter box 1"above sidewalk grada. <br /> 17. Remove and roplace curb, gutter and sidewalk as per City of Everett Slandard Plan#'s 305A 8 306 on <br /> thls proposal's frontage as directed by the PubHc Works inspector(I.e.all unused drlveways and any <br /> broken or damaged area musl be replaced). <br /> 18. Inslall a Type I concrete driveway per City o(Everelt Stendard#307. <br /> 1b. Pave driveway from the fronl property Iine out to lhe slreet paving. <br /> 20. Contacl ihe _Water Districl(or connecting provlsions for this building's water and <br /> sewer servlces. <br /> 21. A catch basin es per City Standard Plan#402 with a gas trap per Standard Plan it410 Is requlred tor the <br /> perking area. <br /> 22. If a sewer pump system Is to be Installed, the pressure Iine must dfscharge fnto e private manhole,then <br /> grevity Oow across the public right-of-way. <br /> 23. A sprinklor system is required tor this building In complfance wilh lhe requirements of NFDA Slandards <br /> 13D. <br /> PWCanments <br />