Laserfiche WebLink
?.F?:�?. 8?�C :C:._ : ,. � :..,.. �_�_ .,. ;':C= �:. 3E 8=.. <br /> ?age Z o: S <br /> 2501 Chestnut <br /> �,ddress : <br /> 1 . Roof Tear off ex:stir,g ho�se roofina comolete to <br /> skip sheathing . Reolace any rott=d starter �oards to <br /> match 1ev=_1 of existina . Install new 3/8 " CCX olywood <br /> over roof complete . Install 15; asphalt impregnated <br /> coof felt over olywood . install anodized metal edge <br /> flashing on eaves and rakes . Install new 220� , <br /> fiberglass composition roofing over felt in accordance <br /> with manufacturer ' s installation insteuction . Register <br /> date of application with roofina manufactur=r . Owner <br /> choice of roofing color . <br /> s 3 000 — i <br /> 2 . Chimney Remove and clean off loose brick from <br /> chimney. Tuckpoint and rebuild existing chimney above <br /> roof Line. Replace any missing or broken bricks. _ <br /> Install new anodized metal flashing in chimney. � <br /> .. <br /> � 13s !� I <br /> 3 . Gutters Remove n:cistinc gutters and downspouts �� I <br /> complete . Install new continuous aluminum 5" ' K ' style ... -i <br /> gutters and matching downspouts. Secure gutter 48 " O.C. o m <br /> in rafter tails . • Guttees : slooe to downspouts . Seal m o <br /> joints with approved sealant . Secure downspouts ton, �� <br /> bottom and at all joints. Use existing splashblocks. o � <br /> �_ <br /> $ 3 00 — r^,,, <br /> o z <br /> c <br /> 4 . Sidin Remove and reFlace damaged sidino boards - � _ <br /> where rotted at bottom course at rear of house , where � ,�„ <br /> paint is spalling (approx . 12 boards ) and where vent was � <br /> � <br /> removed on east side. install trim at gable end vents , �� <br /> �ront and rear . Instal.l new wall to roof flashing where .i <br /> applicable. Caulk ali openings in exterior skin with m.. <br /> .paintable caulking . Power wash siding on house and shed �' <br /> complete . Scrape an/ loose or peeli;g paint on house g N <br /> and trim. Prime al1 new and bare wood with oil based �v+ <br /> primer. Paint en��re house and shed two coats exterior �� <br /> grade latex , two colors , owner choice of colors . . • 9 <br /> x� <br /> $ � 300 — _ <br /> a <br /> z <br /> 5. . Miscellaneous Exterior work Install section of .i <br /> galvanized metal drip edge on eave of shed roof whe�e � <br /> missing. Install over roofing. `� <br /> z <br /> 0 <br /> Cap gas lines through ground and through house on north � <br /> side . Pipe through ground . cap below grade , pipe m <br /> through house : cap as close as pcssible to °lush with <br /> siding. <br /> Install new wrought iron railing and handrail �own both <br /> sides of front steps . All joints welded. Securelv <br /> bolt into concrete steps. Owner ' s choice of paint <br /> color , (black or white) . Repair broken concr�te at <br /> bottom of steps , both sides . R�move e:<is:ir.a oia= <br /> handrail at rear entry �teps . In�tall ❑e�.o wrouaht iror. <br />` handrails down both sides of rsar e�tr;� atecs , same <br />' standar�< as front en:ry ha.^.cr3i'is . <br /> S SDO — <br />