Laserfiche WebLink
CL08ED CM ROR1C ORDSRB REYaRT <br /> Total Utility Maintenance Management System <br /> , 10/09/1997 Page 1 <br /> ------------------- ------- <br /> --- --------------�--------____--------------------_------- <br /> ___avvv=aaavaavvec-av-ecec ________-_ ___�___- <br /> Date Ranqe :O1/09/1989 - 10/09/1997 <br /> CM Work Order ranqe : 1001091070001 - UT0021-35- Pattern :7101236730230 <br /> Itam Ranqa :<Blank> - WVL7694L05 Pattern :* <br /> Program ALL Function ALL Activity ALL <br /> vvaamss�vsas�assa3vavvvvavaevxasvamaevzcvvviceev-xeevvvvcv=evveevvviceavaavvc-aav <br /> CM FiQRK ORDF.R T�: 7101236730230 Title: INSTALL 2602 - CHESTNUT STREET <br /> «DUPLICATE ��1tINTIiTG OF THIS WORK ORDER» <br /> Item ID: -- <br /> Location ID: <br /> Proqt'am 710 Function 123 Activity 673 <br /> Date CompletHd: 09/23/1997 <br /> Overall Craft: <br /> Issued: 09/15/1997 Issued by: HDA Assiqned to: AGA <br /> Out of Service? No Priority: Travel Time: 0.0o Hr. <br /> Meter Readinq: <br /> Downtime: 0 hours <br /> Status: HN <br /> Labors <br /> Craft ID Name Planned Hrs Actual Hrs Cost <br /> ----- ------ --------------- <br /> --------------- ----------- ---------- ------- <br /> HEO AAL ARNOLD, ARTHUR L 0.00 23 .00 465.29 <br /> GLT ACC �YERS, CHAD CARISON 0.00 16.00 128.00 <br /> SUP1 AGA AHLES, GREGORY A. 0.00 6.00 134.16 <br /> HEO COD CHASE, DOUGLAS D. 0.00 4.00 82.08 <br /> CF FLW FRENCH, IAREN W. 0.00 1.00 20.52 <br /> DL HCG HF.�SdA, CORY G. 0.00 7.00 56.00 <br /> EO HHL H1INSEN, HOWARD L. 0.00 1.00 19.29 <br /> UL HRT HANSEN, ROGER T. 0.00 7.00 110.46 <br /> EO MJL2 MITCHELL, JEFFREY L. 0.00 16.00 313.28 <br /> UL NCR NIETHAMER, CHARLES R. 0.00 8.00 126.24 <br /> DL PJL PREWITT, JEFFREY L. 0.00 4 .00 34.00 <br /> EO SDK STUART, DARRELL K. 0.00 16.00 306.40 <br /> EO SDR SCHALLER, DANIEL R. 0.00 1.00 16.58 <br /> UL SGA SMITH, GREGORY A. 0.00 4.00 62.32 <br /> CF SRA SORGEN, ROBERT A. 0.00 9.00 ____183_33 <br /> Total Labor Cost: 2057.95 <br /> Mat�rial�: <br /> Ip Dascription Date N Uaed Coat <br /> ----------------- -------- -------- -------- <br /> 8RIC00061156 BRICK CONCRETE 2" X 4" X 8" 09/19/1997 26 7.02 <br /> CEME00061438 CEMENT 20 MIN. SET 50 LB. BAG 09/19/1997 2 23 .68 <br /> CEME00061438 CEMENT 20 MIN. SET 50 LB. BAG 09/23/1997 1 11.84 <br /> N/A C815/RISER (ASSOC) 09/22/ 658.47 <br /> N/A C.D.F. (ASSOC) 09/26/laQ"� 1 146.21 <br /> PIPE46304347 PIPE 8" PVC SEWER 09/19/1997 52 110.24 <br /> PIPE46304347 PIPE 8" PVC SEWER 09/22/1997 52 110.24 <br /> PIPE46304347 PIPE 8" PVC SEk'ER 09/23/1997 13 _-___27_56 <br /> Total Material Cost: 1095.26 <br /> `b0►4.1.� <br /> qp ,58 <br />