My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2920 CHESTNUT ST 2016-01-01 MF Import
>
Address Records
>
CHESTNUT ST
>
2920
>
2920 CHESTNUT ST 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2017 4:05:04 AM
Creation date
1/26/2017 4:03:29 AM
Metadata
Fields
Template:
Address Document
Street Name
CHESTNUT ST
Street Number
2920
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
144
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. <br /> : <br /> ro Bob Landles, Planning Department � � � � O � � n J <br /> U � <br /> FROM public Works Department� P,UG 1 0 1981 i <br /> DATE Augusi 6, 1981 � �� <br /> CITY OF EVERE'T,7� <br /> SUBJECT S.E.P.A. Checklist Review ��81-48 C�Tr�F EVEREiT, EVEFETT WASMINGT01���11�i� � U��i <br /> PROPOSAL: <br /> 18,512 sq. ft. warehouse add[tion, west slde of Chestnut St. between Hewitt Ave. � <br /> and Pacific Ave. <br /> RECOMMENDATIONS: 'i <br /> [t is the recommendation of the Pub(ic Works Department that issuance of a Negative <br /> Declaration be subject to the following: <br /> 1. Detailed drawings shall be submitted to the Publlc Worka Department showing <br /> parking layout, landscaping, utilities, storm drainage, temporary construction <br /> erosion control, and all required improvements in the public right-of-way. <br /> Publlc Works Department approval of these drawings is required prior to . I <br /> any permiu being issued. All improvements shall be completed, approved, <br /> and bonded before the Occupancy Permit is issued. <br /> 1 <br /> , 2. Clty streets and alleys arc to be�gip�ndaedrstreet cl an nebmust occur assdirected <br /> during construction. Dust suppr B <br /> by the Public Works Inspector. i <br /> 3. All exposed ground must be reseeded wlthin 30 days of the completion of <br /> road constructlon. If bullding activity commences w[thin 30 days of the completion <br /> oi road constructlon, reseeding wlll not be required. If reseeding is not practical '� <br /> due to weather or seasonal problems, the ground must be covered w[th mulch <br /> as directed by the City Engineer. <br /> 4. During construction, all truck trafflc to and from the site within the C[ty � <br /> of Everett shall be on arterial streets uniess otherwise approved by the Publtc <br /> Works Department. <br /> S. Performance guarantees, as required, will be by an approved method as determined <br /> by the City. <br /> 6. A preconstruction conference between appllcant, Planning Department, <br /> and Publlc Works Department may be requ[red prior to approval of Public <br /> Works Permlt. <br /> 7. This slte Is within an area with a building moratorium imposed by the D.O.E. <br /> regarding future sanitary sewer hookups. � <br /> 8. An L.I.D. Covenant for the future Riverside Sewer interceptor will be required. <br /> 9. The alley adjacent to the north'property will have to be improved with dra[nage ; <br /> installed from Walnut Street to Chestnut St. I <br /> l0. The existing sidewalk along the northerly one-half of the property is badly <br /> broken and will have to be replaced. � <br /> . ' <br /> I <br /> � ; <br /> l <br />
The URL can be used to link to this page
Your browser does not support the video tag.