; . , <br /> 3. OFFSITE ANALYSIS AND MITIGATION <br /> This site proposes to construct approximately 3,917 sf of new impervious surfaces. The <br /> following table summarizes the new PGIS and NPGIS proposed both on and off-site for <br /> this project. <br /> PGIS NPGIS Total <br /> (sf) (sf� sf _ <br /> Existing 0 0 0 <br /> Proposed 1 ,207 2,710 3,917 <br /> _ Replaced o 0 0 _ <br /> New 1,207 2,710 --— 3,917 _ <br /> The new impervio�s surfaces will be mitigated using on-site stortnwaler management <br /> BMPs iricluding two level spreaders, soil management and driveway transition zones. <br /> A. UPSTREAM ANALYSIS <br /> During the site visil it was observed tha; ttie only runoff entering ihis site is from the south <br /> in the low area or along lhe east side of the southern property line. As a result none of <br /> these oHsite (lows will be aHected by lhe proposed improvements on Ihis site. <br /> B. DOWNSTREAM ANALYSIS <br /> Runoff from the proposed disturbance area of the existing site sheet flows over the <br /> northern or eastern property lines. The runoH is collected in a low "draw" that drains lo the <br /> north. This low area drains north for approximately 200-feet where it is intercepted and <br /> collected by a long driveway. The runoH on the driveway then flows east over the asphalt <br /> surfacing and is coilected by a slotted drai� approximately 50-feet to the east. This drain <br /> appears to be connected to Ihe piped conveyance system within Ocean Ave to ihe east. <br /> However, if this s�otted drain were to become plugged and overflow the runoft would pass <br /> over the landscaping on the property to the north and eventually be collected by lhe same <br /> drainage system within Ocean Ave <br /> The Ocean Ave. drainage system conveys the runoH b the north and combines with Ihe <br /> conveyance system within Wesl Mukilteo Blvd. The downslream system was lost at ihis <br /> pomt. During the sile visit it was not clear d the conveyance syslem directed the ru�off <br /> norih or east However, the drainaqe system m this area has been long established and <br /> maintained to accommodate the area's runoff So whether the runoN is conveyed to <br /> Powder Mill Gulch Creek pnor to entering Puget Sound or takes another route the <br /> downsiream system is assumed lo be capable of handhng Ihe very slight increase of <br /> runofi expected due lo this pro�ect. <br /> Based on the tad that the new NPGIS and PGIS runoff will be dispersed with a minimum <br /> flow palh of 25' before the runoH leaves the site and that this project only proposes lo <br /> increase lhe total impervious sur(aces on the site by less than 4,000 sf the developed <br /> flows will be slightly higher lhan lhe existing conditions for ihis project a�d ihe offsite <br /> drainage syslems in the downstream path for this site are large enough and accommodate <br /> such a large existing basin, any minor change in ihe flow rale irom this project wiU not <br /> Chinook SFR .. .. -- —.. . 12-013 � <br /> Jan 2012 Page 5 �f/7 / <br /> (y J(-s <br /> \� <br />