Laserfiche WebLink
Od;n��19�5 OS:J? COt�'.J?LiJ'S _Na;,ai C FUTEii .FpiSE 0°. <br /> � � � JN 9e0S0 <br /> i T�omas Jon�f Pp�� <br /> � M�rth 14, 1YOE <br /> supported, or vawl spaces with framed floorinp :houid bo utilized. If som� settl�ment of th� <br /> parape slabe can be tolerated, prope�ty ninforced parap� tlabc can ba conatiuct�d aa el�bs-on• <br /> , pr�d� placed over a minlmum of 1 toot of import�d, pravelly sand atn,ctural flll. Otnerwiso, th�e• <br /> � sl�bs ahould be etn,cturally supported by the pilinp. <br /> B�sod on cur te6t ptt infortnatlon, the iesidenc� to D� con�truet�C on Lol 13 could !aaiibly be <br /> supported by conventional foundations bearinp on the medium-dense, nativ�, silty sand. <br /> Depending on the finai footing pradss, some ovorexavation benea'h the footing� could be <br /> required to exposa competent, netive soll. It �s our opinion that th� topc�raphy and dapth ot fill an <br /> , this tot would m�ke a home with a dayl!pht besement weli•sulted tor thii lot. <br /> I <br /> Geotech Consuitante, Inc. should be allowed to reviaw tha fin�l development plans to v�riy th�t <br /> the recommerdations preaented in this raport are adequtlely �ddressed in tha deeipn. Such a <br /> plan ;eviaw would be saditional woAc beyontl th� cuRent Ycope oi worlc for thia study, and it may <br /> include revisions to our recommendaGons to accommodate sit�, davelopment, and peotechnical <br /> iconstra�nts Ihat betome more evident dunnp th�revlew proc.���. <br /> i Ddtl� C�onc�t� Pl�n <br /> Dnlled, conerete•filled piers may be ue�d to support the rA�ldenees on Lot� 10, 11, and 12. Busd <br /> on our test holes, �t appears that the pian Can be conswcted Dy opan hole methads, but cavinp <br /> soil may be ancountered fn the iooss fill. These piers should b� drilled wifh conv�ntional aup�r <br /> tlnils, bul the driEl�np conVector shoulQ heve accu�s to cesinp, In ca�a slouphinq oCcur�. ConCnt� <br /> ahould not be atlowed to irea-tall to th� bottom ot a hols; It ahould bs elther pumpod or U�mi�d <br /> I fnto trie hoie. If waler is in a holo at the tlme of pourinp, th� concrata should be Vemied lo tha <br /> I bottom of the hole. <br /> A witle vanety ot depths and pier diameters ara possiple, but we recommand usinp a minimum pler <br /> d�ameter of 16 inches. For a minimum ambrdment of 10 faet Into the dense, naGve sand and �ilt <br /> and a pior d�ometer of 16 inches, we recommend assum�np an aliowebie compreasiv� capaclty ot <br /> 30 tons per pier. Based on our subsurface intormaUon, wa estlm�te that pier lenpt�s of �bout 25 <br /> to 30 foet will be requirod to achieve adequate penatnUon Into the be�Anp aeil. CenNr-tacent�r <br /> � piar spacinp should be no Isss than thne Ume� Ne pler dl�m�t�r. <br /> We ectimate that the totat setUarnent ot sinqi� piers installed as descrlbed abova wlll be on N� <br /> order of one•halF inch. Mosl of this s�ttlement shoutd occur durinp lhe constn,ction phai� a� the <br /> dead loads are eppl�ed The remaininp pos;-conatrucUon seNl�ment v�ould be resliz�d �� th� livl- <br /> � loads are applied. We estimate th�t Citterential �atUements over any porUon ot ttie ttructun� <br /> i should be less than about one-quarter Ineh. <br /> The lateral ;apadty of a plar is a function of both the soil that aurrounds the pisr �nd fh� <br /> composition of tha pier itself. We recommend dosipring each pler to canUlev�r 'or th� upper 10 <br /> feet, with ar equlvalent fluid pres:ure of 200 pounds per cubic foot (pefj actinq over two times th• <br /> pier dlemeier wi;hin tha canlilever pallon. For the ralnforcament d�sipn ena the computatlon of <br /> altowable latorat pier loads, Ihe soil adjacent to a drilled pier balow th� rantii�vr portion can bs <br /> ascumed co nave a passive eartn pressuro equai to thet presauro exert�C by a Iluid w�►h a tlen�lry <br /> ot 350 pct acting on two �imes the pier diemetec We recommend rein/orUnq eaeh pl�r its enUro <br /> � lenpth. <br /> IacorccH covsui.r�,v'rs.Uc <br />