Laserfiche WebLink
� <br /> ai ay 5 N/ <br /> CLOSED CM WORK ORDERS REPORT /� � `/ <br /> UTILITIES Total Utility Maintenance Management System �{/ � <br /> 02/26/91 �Page 1 <br /> Date Range : 03/15/88 - 02/26/91 <br /> CM Work Order Range : 1073090001 - 9321230001 Pattern : 6751190301 <br /> Item Range :<Blank> - WVL3694Q09 Pattern :* <br /> Utility ALL Program ALL <br /> --------------------------------------------------------- <br /> CM WORK ORDER ID: 67ti1190301 Title: REPAIR/2424 CLEVELAND <br /> Iten ID: WS2195N046 -- WATER SERVICE <br /> Locati.on ID: -- <br /> Utility 675 Program 119 <br /> Date Completed: 02/26/91 <br /> Overall Craft: <br /> Issued: 02/06/91 issued by: SKL Assigned to: SRJ <br /> Out of Service? NO Priority: Travel Time: 0. 00 Hr. <br /> Meter Reading: <br /> Downtime: 0 hours `; <br /> Status: � a <br /> , t <br /> Labor: <br /> Craft ID Name __ Planned Hours Actual Hours Cost ;t� <br /> ---------- ------------- ------------ --------- � ;� <br /> WSW SRJ STENSETH, ROBERT J. 0. 00 2.00 28 .0( i ;,� <br /> UL TDE1 THOMPSON, DWAYNE E. 0.00 2 . 00 20• 6( I p <br /> � <br /> Materials : " <br /> ip Description Date Number Cost `?y <br /> -------------- -------- ------ ---------- ��j <br /> BOX000037047 BOX SERVICE PLASTIC W/H2^ LID 02/06/91 1 10. 10 '� <br /> COUP32002747 COUPLING 1/2" 3PC COP - CUP a 02/06/91 2 5. 30 � <br /> PIPE32095247 PIPE 1/2" COPPER TUBING TYPE K 02/06/91 2 1. 66 <br /> I :. <br /> Vehicles: <br /> ID Description Date Hours Cost ;• <br /> ------------ --------------- <br /> --------------- -------- ------ ----- <br /> V2139 SVC TRUCK CHEV 86 02/OG/91 2 . 00 3. 56 <br /> s; <br /> Work Description: _______ lj <br /> ----------------- <br /> ---------------------------------------- <br /> HILL: TRI 5TATE CONSTRUCTION ; <br /> 320 106TH NE � <br /> BELLEVUE, WA i <br /> � <br /> � <br /> � <br /> � <br /> �� <br /> '.� <br /> a <br /> � <br /> j e <br /> I �� <br /> I <br /> 4 <br />