My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3003 W CASINO RD BLDG 40-33 2018-01-02 MF Import
>
Address Records
>
W CASINO RD
>
3003
>
BLDG 40-33
>
3003 W CASINO RD BLDG 40-33 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/15/2022 11:36:48 AM
Creation date
1/26/2017 9:13:00 AM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
3003
Tenant Name
BLDG 40-33
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
623
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
+ " ` � • F:TLTeatingLoburalorics.lnc. <br /> Inchcape Testing Services ���������n,�lA U8055 ,S"'� <br /> � ETL Testing Laboratories ������,���„���,^oa,-=R.��H� <br /> r��r t"-oe�+»-oei i <br /> February 7. 7995 � 1517150 v � D <br /> Mr. R o b F l y n n F E B - 3 1 9 9 5 Ph: 12os) 3as-soso <br /> Electroimpact, Inc. � Fx: 1206) 34 8•0 7 1 6 <br /> �. ......................................... <br /> 46os 107th Street SW ��CITY OF EVERETT <br /> Mukilteo, WA 98275 p��lfc Works DeP� <br /> Subject: Field Evaluation Report of Four ldentical Rivet/Lift Systems. <br /> Reference: Inchcape Order No. 94043-208. <br /> Dear Mr. Flynn: <br /> This letter represents the results of the evaluation and tests of the referencad subject <br /> equipment to the requirements contained in the Standards for Industrial Machinery, (NFPA 79- <br /> 1991), Industrial Control Equipment, (ANSI/UL 5081. ISee attached for specific equipment <br /> details.) <br /> The equipment covered by this Report was evaluated from December 14, 1994 to January <br /> 31, 1995 at Boeing's facility in Everett, Washington. <br /> The equipment noted in this Report has been investigeted to the referenced safety standards <br /> and as far as practical in the Field and has been found to be in essential compliance with <br /> those requirements. The installation methods and final approvals at the installation site are <br /> the responsibility of the Authority Having Jurisdiction. <br /> At the conclusion of the investigation the subject equipment was labeled with ETL serialized <br /> field lebels. Complete investigation information is on file at this office. Please note,this latter <br /> does not represent authorization for the use of the ETL Listing Mark. <br /> In Charge of Test • Approved BY: <br /> � <br /> ohn D. Qwgley <br /> Paul E.�kl��e� <br /> Engineering leani Leader ;'iu�ecf Engineor <br /> Seattle Office Seattle Office <br /> West Coest Division West Coast Division <br /> cc: Inspection Authority <br /> Mr. Tim Alaniz Ph: 12061 259•8810 x 2459 <br /> Electrical Inspector <br /> City of Everett <br /> Public Works Department <br /> 3200 Cedar Street <br /> Everett, WA 98201 <br />
The URL can be used to link to this page
Your browser does not support the video tag.