Laserfiche WebLink
• Oamnq Suppor�Surviccn ' <br /> ' ' P�3 Buy J707 <br /> , So.tlO�l NJA01112A�[207 <br /> � � � �on� D <br /> AuguSt 26, 1991 • <br /> 4-7300-KG91-E-131 1;11G :. : 1991 <br /> � CITY OF EVERETT <br /> Planning Dept. <br /> Mr. Paul Roberts <br /> Director of Plenning and Community Developmont <br /> BOE/iV6 City of Everett ' <br /> 3002 Wetmore <br /> Everett, WA 98201 <br /> Sub�ect: EIS Landscape Improvements <br /> Everett Facility <br /> Boeing Commercial Airplane Group <br /> Dear Mr. Roberts: <br /> The Draft Environmtntal Impact Statement has clearly steted the landscapin�d <br /> requirements to be imposed on the Everett Facility. Boeing is contracting wfth <br /> a landscape archkect to implement these requirements with dosign drawings <br /> and specificetions. These plans and speciNcations will be submitted to thi3 <br /> Ciry of Everett for your review and approval as required. Boeing will hire a <br /> landscape contractor to complete the landscaping per the approved design. <br /> Figure 17 of the Draft EnvironmeMal Impact Statement outlines the landscape <br /> areas to be sterted in 1991. The legend has two areas wfth the appraximate <br />� trigger permit year of 1991. <br /> "Area 1" is along the north and south sides of Highway 526; and along the <br /> west side of Airport Road irom Highwey 526 to approximately th� Kasch Park <br /> Intersection. The design drawings and specifications for this araa will be <br /> complete by December 31, 1991. The landscape installatfon for"Area 1" will <br /> be complete by August 15, 1991 unless substantial delays an3 experienced <br /> due to inclement weather conditions or unfavorable planting times. <br /> "Area 2" is along the west side of Seaway Boulevard from south of the 40-87 <br /> building to the Boeing north property line, and along the north property line <br /> from Seaway Boulevard to the 40-95 building. The design drawing and <br />