Laserfiche WebLink
�i� — � c G3� . <br /> —� eos�MarEs --- � <br /> TESTING ENGINEERS, INC, <br /> . August 2, 1994 <br /> • <br /> City of Everett <br /> Building Division <br /> 3200 Cedar <br /> Everett, WA 98201 <br /> Permit Il B38588 ' � <br /> Re: �77 Fatigue Loed Building ` � <br /> Boeing Plant - 75th Street SW ` <br /> Everen, WA � <br /> � <br /> . ' <br /> GenQemen, � <br /> This is to inform you that registered special inspections have been completed for this project. ; I <br /> All work inspected was either performed in ucordance wilh, or corrocted to conform to, the <br /> city approved drawings, or engineer approved chenges. <br /> Special inspection was provided for. <br /> ! <br /> 1) Structurd Erec.tion - Field Welding �nd Bolting i <br /> (Fabrication Shop Inspection was performed by others) <br /> 2) Nondeswctive Testing of Field Welding <br /> Wa uust that this provides you with the informallon which you require. Should you have any <br /> questions give us a call• � <br /> Sinceroly, I <br /> BOSS 8c MAYES TESTING ENGINEERS <br /> G/� 1 <br /> ' ael . es� P.E. <br /> Mich <br /> Principel , <br /> MJM:Imm <br /> 0169I.cb <br /> cc: CMTS - Willie Gollhoffer <br /> 917-1341h St.S.W„Sulte A-1 • Eveteft, WA 98204 • (206) 742-9360 • FAX(206) 745-1737 <br /> i <br />