My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3003 W CASINO RD 1992 BLDG 40-41 2018-01-01 MF Import
>
Address Records
>
W CASINO RD
>
3003
>
BLDG 40-41
>
3003 W CASINO RD 1992 BLDG 40-41 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2018 9:19:34 AM
Creation date
1/26/2017 10:22:52 AM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
3003
Tenant Name
BLDG 40-41
Year
1992
Notes
SITE WORK & UTILITIES
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
, � <br /> . <br /> September 25, 1992 <br /> page two <br /> hydrology of the subject wetland, and is not permitted under .� <br /> Subsection 2.b(1) (ix) of the Decision Document. A 10-foot <br /> construction setback from the edge of the buffer is • <br /> required. <br /> 3. Netland Hydrology. The present plans do not indicate <br /> drainage measures (or requested calculations) for transport <br /> of roof drainaqe to Wetlands G and H. <br /> 4. Indicate sensitive Area Location on Plnns. All streams, <br /> wetlands and their required buffers must be shown on the <br /> permit drawinqs. In addition, the top-of-bank of all slopes <br /> greater than or equel to 258 must be clearly delineated. If <br /> alteration of steep slopes which are not in conjunction with <br /> streams or wetlands is proposed, eoeing must submit an <br /> application for slope setback modification, per Subsection <br /> 2.b. (2) (i) of the Decision Document. Such an application <br /> muat include a geotechnical report. <br /> No permits will be issued, and no site work shall commence until <br /> these issues are resolved. Plense revise the permit drawings in <br /> accordance with the requirements of this letter and the Decision <br /> Document and submit them to the Buildinq/Public works Department. <br /> Note: in order to expedite the review process, you may want to <br /> provide an additional plan set to our office. <br /> Thank you for your cooperntion in this matter. <br /> Sincerely, <br /> _J.1 <br /> Gary Doughty, enior Planner <br /> cc: Dan Walsh <br /> Kirk Brooks <br /> Stephen Stanley <br /> attachment <br />
The URL can be used to link to this page
Your browser does not support the video tag.