Laserfiche WebLink
, + <br /> r S�uwnc W.��b1,���cssuu Bnxr;sNme .Inc. MEf110 <br /> Cu+wn.npGvucmr�i�nfCir� C�q�nca� <br /> 1:2U I EIL�1rcxc.5uuo!A] Sr�In��Wn YtlIU�ZN' <br /> f��b12?3�t0� �AK',Ra1G)3�7fA6 <br /> io Mr. Leonard Astembrowskl - BE&C ENGINEERS ru+Tt 8/29/92 <br /> __y , .._ _. ._ . <br /> FROM , Larry A, Onoratl_. � , t � L _. _ - . _ — <br /> PROJECT gQE�NG 40:4.LZ7LE;Ni31�lEF.RINO TEST,EflSlLLTY��V�RETT WASHINOTON __, <br /> suaecr �� cveren qe�� r.�mmomQ .. . _.. . _ —. _.. <br /> i <br /> The toliowinp is our response to the varlous C1ty ot Everett comments: <br /> �. The setbeck}rom wetland stree.m corrldor A has bean set at 60 teet, This 60�foot butter extends <br /> I <br /> up the exlatinp native soll bank,whloh exceeds 25 perCent, Enpineered fill la belnp placed near � <br /> the top oi the bank stream corrldor A lor en additlonal heipht ot approx(mately 10 feet. Thls , <br /> enpineered 811 meets !he EIS requlrement ot 02p Isterel ateblllty as de}Ined by the solls <br /> enpineer, Demes & Moore, �n thelr solls reporl. From our discuasions with the Boelnp proJect <br /> pereonnel snd City of Everett, Iit Is our �mderstandlnp that since the 60-foot setback Is belnp <br /> sdhered to, the 25-toot setback tor the tap o1 stream corrldor A does nol apply, since we are <br /> puttinp In enpineered flll, Plenee refer to the reaubmitted drawinga, Revision A, deted , <br /> September e, ie82 (refer to Drawing COEsO, Final Oreding Plan). � <br /> 2 of 601eetC Thlsms sh�own onitlieeesubmitt d d ewinps, Reval ntA�dated`September�eet982 <br /> (reter to Drawing C080, rinal (3rading Plun). <br /> 3 oeThiBle Ind cla�ed on t e revisedls teot d awlnqsXlRev s on A dated September BeB 892 (rale�r <br /> to Drewlnp C200, Drelnape Plan, Submitted Wetlands f38H Recharpe calculatlons). <br /> 4. SWMB has not devaloped a buffer Revepetative Plan, end ihis IB outside our scope of work. <br /> If this plan ie required, and must be prepared by a qualllled wetiands blologlsUbotanlsl,we wlll <br /> asstst Boaing and thelr wetlarnfs blologlsUbotenlat In the development of thie plan. <br /> 5. The fatigue test slab hydraulic oil contalnment Is based upon a 25-year rainfell Inteneity and a <br /> 3,000-gallon hydrauliC oll splli. The coalesclnp plate olVwater separators have been sized to <br /> contefn the design splll and Independently allow the 25-yeer desipn storm to pass, keepinp the <br /> effluent rate at or below 10 ppm. Currently, the dlsCharQe Is to the storm drainaqe syetem after <br /> o(Uwater separetlon, An oll stap valve has been provided to insure thst the hydraulic oil Is <br /> conteined. � ,,: t ,�,< < �, ..-,y,�, <br /> % 3 O�%'�. <br /> Please cafl If you have any questlons. � <br /> f.�; ���n ,,. <br /> ��� /���„r n <br /> LAO/dmr ' <br /> ����� � ��� a � /'�✓, s.d �La ,� S � <br /> d « ' <br /> 1� • � � �Qi� ��-s ./4 �c. <br /> /� ��1� ,, ,, , ., ,, <br /> �- <br /> k%;-1- , <br />