Laserfiche WebLink
E <br /> I <br /> �.. <br /> Upon submittal of the drawings, your application will be given prioriry and plan review <br /> will commence. <br /> , All requirod submittals shall be of sufficient detail and wntain sufficient informadon to <br /> ensure that the proposed structure will be constructed in compliance with all adopted <br /> codes. <br /> Sincxnly, `� <br /> /��� <br /> / <br /> Steve Milier <br /> Associate Enginar <br /> aM:�a�s»e� <br />