Laserfiche WebLink
. 1 �\ . <br /> � L� G� � � dL� D <br /> MAR1419A� �"''D1M � �� � � � � d � '' �II <br /> BOEING 40-56 PHASE 1 <br /> PR�,TfiC1' N0. 73-89-114 L.J � MAR 1 4 1989 U <br /> EVERETT BUILDING DEPT. 'i <br /> ................................................... <br /> DATE: March 9, 1989 CITY Ur EVERETi <br /> PubGc Works Dept. <br /> T0: JGA Pro,jecL File No. : 73-89-114 <br /> &�eing 40-56 <br /> FROM: 3cott Kruae <br /> fiE: Code RevieW with Ben Frlcmrda, Mr_1 Peterson, Kelle�� Wilson. Scott tiruse. <br /> A revieN of the Code Check Drawin6s as prepared b}• dGA yielded the following <br /> pointe: <br /> 11 E¢ress tunnel ahall be continually ventilated with fire dampers a� <br /> penetrations. <br /> 2) JGA will inveati�ute the code implications caused by wirine Iconduit end <br /> ca61e tray) in the egreas tunnel. <br /> 31 Buildin� will be a 82 occupancy end be of T,vpe Ii-N construction. 1Lnne1 <br /> uill be one hour reted. <br />� <br /> 4i The expansion Nill be open to the existing 40-56 building beloW the 17'-0" <br /> level. <br /> 51 It Fss noted that the egrese stsirs to the tunnel Nill be approximatelY 10'- <br /> 0" north of tifiere the exieting north hall of the 40-56 building. <br /> Ben r�as �iven a set of Code Check Draxings and a aet of preliminary Phase I <br /> Drarrin�s. <br /> Different options were discussed as to how permitted foundation uork could begin <br /> as early as March 15. Ben Edwards will follou-up these optiuns. <br /> If there are eny questiona or camnenta on the above minutes please aontact me as <br /> soon as poasible. <br /> x: Mel Peterson <br /> Ben Rdwards <br /> Kelley Wilson <br /> Deve Berg <br /> Reed Lyons <br /> Dick McInell}� <br /> Nerb Rozendeal <br /> � JL7HN GRAHAM ASSOCIATES <br /> DLR Group <br />