Laserfiche WebLink
DAMES & MOORE . PROFESSIONAL LIMITED I'A91MH 91I I' <br />500 MARKETPLACE TOWER, 2025 FIRST AVENUE, SEATME, WASHINGTON"121 <br />ll (206) 728-0744 <br />April 15, 1991 <br />SSOE, Inc. <br />3015 112th Avenue N.E., Suite 101 <br />CBellevue, WA 98004 <br />Attention: Mr. Lee Miesbauer <br />(� Mr. Bill Shorey <br />Geotechrical Investigation <br />Proposed Building 40-56 Expansion <br />Boeing Everett Facility <br />j} Everett, Washington <br />L� For the Boeina Company <br />Gentlemen: <br />We are pleased to submit herewith our'Report of Geotechnical Investigation, Proposed <br />( Building 40-56 Expaasion, Boeing Everett Facility, Everett, Washington' Work on this <br />project was authorized by you on February 22, 1991 and was performed In accordance with <br />( our January 24 proposal and March 12 Revised Cost Estimate. <br />During the course of the investigation, we have conveyed preliminary recommendations <br />to you as data have been reduced and analyses have been completed. The attached report is <br />a formal presentation of the previous verbal recommendations, with occasional modifications <br />and other relevant recommendations that were formulated during our study. <br />OMCES WORLDWIDE <br />