My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3003 W CASINO RD BLDG 40-81 2018-01-02 MF Import
>
Address Records
>
W CASINO RD
>
3003
>
BLDG 40-81
>
3003 W CASINO RD BLDG 40-81 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/15/2022 2:43:26 PM
Creation date
1/26/2017 12:06:51 PM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
3003
Tenant Name
BLDG 40-81
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
248
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
., <br /> � �� SCOPE OF WORK� <br /> CAS RELOCATION <br /> JOB #991 CAS <br /> The Purpose of this job is to relocate and consolidate "CAS" (Commercial <br /> Avionics Systems) from the 18-234 and the 7-119 buildings. The <br /> relocation/consolidation will be done in two phases. Phase 1 wili be the <br /> relocation of CAS from the 18-234 building in Kent ta the 40-81 building in �, <br /> Everett, and Phase 2 will be to relocate the CAS operation from the 7-119 <br /> building and consolidate them in the 40-81 building with the other CAS <br /> operations. Phase 1 will happen in 1999 and Phase 2 is scheduled for 2000. <br /> The phasing of the project should create design considei�tion as to not effect <br /> the CAS operations from phase 1 with the conswction of Phase 2. Tl�e <br /> project is Not funded for Cap;tal Equipment purchases. <br /> Phase 1 scope of svork contains hut is not limited to the scope of work listed <br /> below. The phay�e 1 scope of work will be to relocate 8.5 K of lab space and <br /> 70 hc:ads of o�ce sitters from the 18-234 building to the 40-81 building. (1) <br /> In urder for Phase 1 to happen in the 40-81 building we will have to relocate <br /> the employee's out of the NE& NW bays of the 40-81 building, and remove <br /> the poolstock fumiture and systems fumiture. (2) Remove the carpet from <br /> the entire raised floor azea, then clean and reseal the dled area. (3) Erect 180 <br /> Liner Feet of Demountable wall partitions. (4) Insta(I a firebreak under the <br /> raised floor area as indicated on the coded layouts. (5) Install a CO2 fire <br /> suppression system under the raised floor area indicated on the coded <br /> layouts to support the use of sircraft wiring cables. (6) Install Electrical: <br /> 120V, 208V/SOhz, 60hz, 400hz power as indicated in the attached layouts. <br /> (7) We will be relocating existing SOhz M/G set, plug panel sets, vacuum <br /> pumps, vacuum pump shutoff panels, power conditioners, and <br /> HVACMumidifiers. (8) Install Mechanical: vacuum pumps and piping as <br /> indiGated on the attached layout. (9) Install Mechanical: A compressed air <br /> line from the factory into the 40-81 building via tunnel access. Then provide <br /> compressed air into the areas indicated on the attached coded layout. (10) <br /> Mechanical provide HVAC/Humidifiers in the indicated location on the <br /> attached layout. The HVAC units will be required to maintain a temperature <br /> level of 68 to 78 degrees with a humidity level between 40- 60°b. (11) We I <br /> will be relocating exisdng electrical benches, desks, CRT's, tables, tote <br /> boxes, c�stomer equipment, and storage racks. (12) We will provide a file I <br /> server room with electrical and data drop requirements as indicated on the � <br /> coded layouts. (13) 'Ihe tile areas will require cutdng for under floor access. i <br /> � <br /> `i <br />� <br />
The URL can be used to link to this page
Your browser does not support the video tag.