My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3003 W CASINO RD BLDG 40-83 2018-01-01 MF Import
>
Address Records
>
W CASINO RD
>
3003
>
BLDG 40-83
>
3003 W CASINO RD BLDG 40-83 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/21/2018 9:29:24 AM
Creation date
1/26/2017 12:18:43 PM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
3003
Tenant Name
BLDG 40-83
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
369
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 4 <br /> 7.0 EQUIPMENT DISCREPANCIEB AND REQOIRED CORRECTI0279 <br /> 7. 1 IEM 15kV Load Interrupter Switchgear Assemblies. <br /> 7. 1. 1 The ahain installed to the inverted (lower) <br /> switch operator at each switchgear is crossed <br /> at mid-span and is aubject to excessive <br /> friction and tension durinq switching <br /> operations. The chain guard mechanism shown on <br /> , the manufacturer's literature has not been <br /> installed on these assemblies. Chain guards <br /> shall be installed in accordance with <br /> . manufacturer's instructions. <br /> Reference: NEC Article 110-3 (a) <br /> Reported: 12/24/93 , <br /> Correotioa: Chain quards have been installed in � <br /> accoidance with the manufacturer's inetructions � <br /> as required. <br /> v.riri.a: 12/27/93 i <br /> 7. 1. 2 The chain to the inverted (lower) switch I <br /> operator on the unit desiqnated "Sub SO-3" was � <br /> removed prior to our initial inspection. This � <br /> chain must ae replaced before evaluation of <br /> this equipment can be completed. <br /> Reported: 12/24/93 I <br /> , Corr�ation: The missing chain was replaced as <br /> required. Function checks were performed to I <br /> � verify proper operation of the switchfng <br /> ; mechanism. <br /> ' Verili�d: 12/27/93 <br />, � � . 1. 3 The uninsulated bus connections near the bottom i <br /> . of this switchgear assembly do not provide <br />� adequate phase to ground clearance between live <br /> ' bus and the grounded shield of the 15kV feeder <br /> cables. In some cases, this clearance is as <br /> ; ' low as one inch. The followinq corrections are <br /> � . required: <br /> (1) The 15kV cables shall be routed in a <br /> manner to maximize the phase to ground <br /> �„ clearance within each switchgear. <br /> (2) The uninsulated bus connections shall be <br />�, „ insulated with approved material. ' <br /> Reference: NEC Article 710-33, Table 710-33 <br /> �" Reported: 12/27/93 <br /> Correotion: Cables have been routed, and bus <br /> connections insulated as required. <br /> � Verified: 12/27/93 <br /> fi <br /> M �'' <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.