My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3003 W CASINO RD 1991 BLDG 40-87 2018-01-01 MF Import
>
Address Records
>
W CASINO RD
>
3003
>
BLDG 40-87
>
3003 W CASINO RD 1991 BLDG 40-87 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2018 8:44:14 AM
Creation date
1/26/2017 12:53:26 PM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
3003
Tenant Name
BLDG 40-87
Year
1991
Notes
SITE WORK
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
495
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
, <br /> The spec�Ac technical kems et issue ere as tolbws: <br /> 1. Sizinp e►1d CepeCity of'Fluka Phese 11 Detention Pond B". With the <br /> recent Boeinp purchasa of Fluke property this pond is preseMly <br /> loceted on the Boelnp site. AddRionel cxJculetions have been <br /> . requestecf and will be developed Per the cunent storm drainage <br /> requfremente. If these cak:uleNons show the pond to be inadequate <br /> we wlll modHy tha pond to compy wkh current code requirements. <br /> BOE/NG (Note, we are awere of the sensidva plent spec9ea (ScUpua <br /> cyperinus var.brachypodus) in the pond arsa and wfll teke proper <br /> preceuNons to rebcete or avoid harminp these plants M <br /> constructfon is required.) <br /> 2. Slzinp and Capadty of"Fluke Pond A". It wes discovxed in tha <br /> referenced meeUnp a di8ererx�of interpretetion exists conceming I, <br /> the oripinal cek:uletlon tor this detention pond. mis pond was <br /> originelN develo�ed by the John Fluke Manufacturinp Compeny in <br /> con)unctlon wid�me [3oeinp compeny. 1lddidone�ca�u�enons ere <br /> now being developed to determina R the e�dsdnp pond can meet tha <br /> cunent storm weter runoff code lor the weter trom tha Boeinp site � <br /> while melrttaininp the John Fluke Mfp.}low. If modfAcetions ere I <br /> requfred to meat the cuRent repulallone for the flow we will work � <br /> wkh John Fluke Mfp. to provide addidonel cepacity to Pond"A', per <br /> an enisdnp kGe� aGreement between the two compenies. B en <br /> ayreement wkh John Fluke Mfp.to allow construction to oa;ur et <br /> Fluke pond •A•cenna be reacr,ed, eoelnp wi�� provide adequerte <br /> storm water detemion on the Boainp site wh�h complies wRh <br /> cuRertt codes and the requirements of the EIS Dedsfon Document. <br /> 3. Boefnp preseMed the desipn concept for the direct pipfnq oi <br /> stormwater overflow direcdy to the Flukb Pond "A" bypas�sinp <br /> wetland "B" es agreed to In reference'C". Two pipe routes were <br /> preser�ted, one routing the pipe under the axistlnp deared aecurity <br /> path on Boeinp's property and one roudnp the pipe on John Fluke <br /> Menutecturing property adjacent to tl�eir paved roedwey. Dennls <br /> Beich oi the City oi Everett epreed to walk the ske and detertnine <br /> which rouNng would have the bast impact on the weUend 'B`and <br /> the wildlKe conidor. � <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.