Laserfiche WebLink
THE BOEING COMPANY <br /> Mail Stop: <br /> F.O. Box 3701 <br /> Seattle,Washington 9b124•2201 <br /> July 7, 1987 <br /> T-6140-7-252 <br /> City oP Everett Planning Departrnent <br /> Atten,ion: Mazy Cailahan <br /> �002 lVetrnore Avenue <br /> City N�:11 <br /> E�erett, WA 98201 <br /> Subject: EIS Miendrrknt for 45-01 Ctuilding Paint Hangar Modernization ar.d <br /> Modification <br /> Dear Mary: <br /> The Pxisting 45-01 Building Paint Hangar .is approximately 20 years old. As e <br /> rnsult a progran has been initiated to update this facility. The work includes= <br /> Constnrction of a 50' X 90' addition at the south end of the existing <br /> hangar building. This new facility will serve as an airlock to tl�e <br /> hangar and a miscellaneous parts p�int booth with a partitioned azea <br /> on the east side to house a trash crnQactor. The paint booth function <br /> requiree the installation of a dry filter paint arrestor/ventilation <br /> systen. The trash ca�actor area naturally requires the it�stallation <br /> of a trash cv�Qactor with auto cart dtm�. (See drawing A-02) <br /> Construction of a 50' X 102' addition at the east side of the existing <br /> hangar building. This new area will be the paint storage and staging <br /> area for the hangar. The west side of this additi.on will contain an <br /> airlock to the hangar and a 10' X 10' office. At the north end of the <br /> new storage addition is an optional 20' X 50' training iroan to be con- <br /> structed if the budget allavs. <br /> Remodel of an existing 5,000 square feet hangar support area to serve <br /> as the paint mixing, cleaning and dispensing area with partitioned off <br /> mctns to house two small maintenance shops and a miscellaneous equip- <br /> ment storage man. The pai�t mixing and cleaning function requires <br /> the installation of both new and rnlocated mixers, and the insta'_larion <br /> of manual and autanatic cleaning equipment. <br /> Additional miscellaneous items includec Rework nf the existing hangar <br /> air filY.ration systen including installation oE a new clarifier. <br /> ��erhTul of the existing Stacker Crane Systcm. Revision of drain <br /> piping withiT the hangar to in^,ure the correct de^tination for all <br /> waste liquids. <br /> �T.�.7£1. S!.i <br />