My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3003 W CASINO RD BLDG 40-31 2018-01-02 MF Import
>
Address Records
>
W CASINO RD
>
3003
>
BLDG 40-31
>
3003 W CASINO RD BLDG 40-31 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2022 3:44:51 PM
Creation date
1/26/2017 3:06:50 PM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
3003
Tenant Name
BLDG 40-31
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
276
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� Inchcape Testin py���� p ETI.Testing Lubormorics,Inc, <br /> ldin �' •��1i5 I100\Inplr.\rrnuc.S.1C. <br /> ETL Testing Laboratorie �� � �; �S�� � , n`���110,�� � °ND53 <br /> � <br /> � � lS � �P�•Icphnnr(�Oli) „aioao <br /> 3ci�3 c.J C.s3'��Q5 95 �.�..� r,�ri�nai�;r-oeu <br /> July 24, 1995 �9 <br /> ......CITy.. ... <br /> yo_3 <br /> -- OF�eVERETT"'" Pn: (2os1 3a2-o387 <br /> Boein� Company G-y�6� P�b��c Worl� pep� Fx: (206) 342-5490 <br /> Box 3707 �H-27 _p , (],p,,,,,, ,,{' � <br /> Seattle, WA 98124 w��i r-�������� <br /> Subject: Field Evaluation Report of a Du"rr Ecoclean De-Greaser Control Panel. <br /> Reference: ETL Order No. 98427-208. <br /> Dear Mr. Phung: <br /> This letter represents the results of the evaluation and tests of the referenced subject <br /> equipment to the requirements contained in the Standard for Industrial Control Equipment, <br /> (ANSI/UL 508). (See attached for specific equipment details.) <br /> The equipment covered by this Report was evaluated from April 11, 1995 to July 24, 1995 <br /> at Boeing's facility in Everett, Washington. <br /> The equipment noted in this Report has been investigated to the referenced safety standard <br /> and as far as practical in the field and has been found to be in essential compliance with those <br /> requirements. The installation methods and final approvals at the installation site are the <br /> responsibility of the Authority Having Jurisdiction. <br /> At the conclusion of the investigation the subject equipment was labeled with an ETL <br /> serialized field label. Complete investigation information is on file at this office. Please note, <br /> this letter does not represent authorization for the use of the ETL Listing Mark. <br /> In Charge of Reviewed By: <br /> .' I.,,.QJ.��� <br /> �ohn D. Quigley Paul E. VanSickle <br /> Engineering Team Leader Project Engineer <br /> Seattle Office Seattle Office <br /> West Coast Division West Coast Division <br /> I <br /> cc: Inspection Authority <br /> Mr. Tim Alaniz <br /> Electrical Inspector <br /> City of Everett - Public Work, Department <br /> 3200 Cedar Street <br /> Everett, WA 98201 <br />
The URL can be used to link to this page
Your browser does not support the video tag.