My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3003 W CASINO RD BLDG 40-56 SITE DEV 2018-01-02 MF Import
>
Address Records
>
W CASINO RD
>
3003
>
BLDG 40-56 SITE DEV
>
3003 W CASINO RD BLDG 40-56 SITE DEV 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2025 2:54:56 PM
Creation date
1/26/2017 3:20:42 PM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
3003
Tenant Name
BLDG 40-56 SITE DEV
Permit
PW 91-278
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� DAMES & MOORE <br /> ..• SD'J MARl�GI'PLACf:'1'OWIiH. 20:5 19Kti'P AVI3Nllf:, SEA7'17.f:, WAtiHINGPON 9R1.1 <br /> I.OG) 7:8�0744 PAX: (2(X�)d�8-7994 <br /> July 27, 1992 <br /> SSOE, Inc. <br /> ' 3015 112th Avenue NE, Suite 101 <br /> BeIIeWB, WeShingtOn 98004 <br /> Attentlon: Mr. Jlm SchetNer <br /> Report of Construction Monitoring <br /> Building 40-56 Expansion <br /> Everett, Washington (or the <br /> Boeing Company <br /> Job No. 695-529-0i6 <br /> Dear Mr. Schettter, <br /> This report contains a summary of our geotechnical•retated tield monitoring activitfes associated <br /> with constructlon of ihe expanslon of Building 40•56 In the 8oeing Everett Facflity, Everett, <br /> Washington. Our services were provkled over the period rrom July 1991 to July 1992. <br /> The scope ot our services was Identified In the Dames 8 Moore proposal of June 12, 1991. The <br /> monitoring services were Ilmited to those aci(vitles takfng place within the building (ootprint only. <br /> Geotechnical recommendatlons for the expanslon were presented primarily In the Dames&Moore <br /> report of Aprfl 15, 1991 and an addendum report dated May 16, 199i. <br /> DESCRIPTION OF SERVICES <br /> CAISSON INSTALLATION <br /> A total of 53 caissons (drilled piers) were Installed by Franki Company In the building area from <br /> Cdumn Lines 5 to 6.1 (see Plate 1). An additional 4 caissons were installed at the Accumulator Pad <br /> Iocation�ust southwest of Column CC•5. Our representative was present during the drUling of each <br /> caisson to measure and Inspect the shaft and bell. A record of eacti ca�sson installation was <br /> maln[alned whlch Includcd data regarding driiling tlme, casting tlme, soll and groundwater <br /> conditions encountered during drilling and the presence of gases within the calsson. The design <br /> , and as-built dimensions we•e also measured. Table 1 presents e summary of the caisson data. <br /> All calssons were drilled at locations set by surveyors from Wright Schuchart Harbor Company, <br /> . the genoral contractor. Th�3 caissons were embedded at least 5 foet into the natural glacial till <br /> and/or glaclal oulwash sand and gravel. Inspeclfon of steel and concrete was provfded by PSI,Ine. <br />
The URL can be used to link to this page
Your browser does not support the video tag.