Laserfiche WebLink
January 2, 1991 <br />To: Building Permit Pile 6 General Hospital SPU <br />From: Steve Ingalshe <br />RE: General Hospital's break out addition <br />General Hospital is proposing to build a 97B square foot <br />break out room, an area for removing supplies from boxes <br />that are delivered to the hospital.The <br />addition <br />sting building <br />be almost completely surrounded bythe adjacent properties or <br />The <br />and will not be visible from anynbreak out room can be <br />public right-of-ways. small in size when <br />considered n accessory use and is so swe <br />compared to the existing hospital that a Special Property <br />use permit will not be required. <br />t, <br />