Laserfiche WebLink
AIM■ <br /> MEMO/TRANSMITTAL <br /> n Bat*, <br /> P. <br /> sch, Nash & Nall <br /> Andt sc*& S. <br /> DATE 11-13-00 <br /> To City of Everett Biog. Dept. PROJECT PEMC 48 South <br /> Tony Lee _ Joe NO 1347 <br /> NUMBER OF PAGES <br /> INCLUDING THIS COVER 4 <br /> MESSAGE Please see the attached copy of the Information regarding the existing 2 hr. shaft. Attached is a partial copy of the existing 2', 3'° & 4' floor 1966 <br /> construction as-built drawings for the existing shaft area. It appears that the shaft <br /> was constructed as a 2 hr. shaft. The contractor has confirmed that the shaft <br /> waa on the three floors are constructed as noted on the 196E drawings. I would <br /> like to request your rsyssw and approval that no further work is required as these <br /> shah walls were constructed as required for a 2 hr. rating. Your attention to this <br /> would bs *Wooated <br /> Sevin Snykr r <br /> FROM ORIGINAL <br /> COPY TO WILL BE SENT <br /> X <br /> WILL NOT BE SENT <br /> 19'S 4i..n Awnw•Ewan WA 99201 •42S-2S9-0666• 12i.774J741 •FAR 425-n2-4334•. mill bniebnhorcn cool <br />