Laserfiche WebLink
` 3 <br /> ii n > <br /> = � � <br /> :3 F � <br /> !� E � < <br /> E <br /> e�c u a z° <br /> C 5 � Complete plans and specifications for the firo alarm system installation or <br /> modificadon shall be submined for review and approval prior to system installation. <br /> P�ans and specificadons shall inciude, but not be limited to, a floor plan; locadon of <br /> aIl alarm-initiating and alarm-signaling devices; alazm-control and trouble-signaling <br /> equipment; annunciation; power connection; battery calculations;conductor type and <br /> sizes; voltage drop calculations;name, address, and phone number of the agency <br /> receiving off-premises transr.ussion of alarm; and the manufacturer, model numbers <br /> and listing information for all equipment,devices, and materials. Incomolete nlans <br /> and specifications will be retumed without review. Plans and specifications may be <br /> submitted sepazately from consttuctiun documents during the consWction of the <br /> project. For small renovation projecls in which devices are onty to be relocated, a <br /> plan that shows the relocation of devices can be submitted for review in lieu of the <br /> above requirements. Seclion 10013, Unifocm Fite Code <br /> Approved Ol/OAl03. <br /> C 6 O Provide handwash sink for ICRU, and ICRU3. <br /> Approved 11/15/02 -Sinks provided in hall way and rooms. <br /> C 7 O Swing doors from toilets outward. WAC 246-320-525(2)(e)(iv) <br /> A 7.1 Nct Approved i 1/25/02- Define who will have access to Toilet C335. <br /> Approved Ol/13/03 - Revised Drawing A2.3C label Toilet C335 as a Statf Toilet <br /> C g p Provide cross-corridor opposing-swing doors at south end of corridor B386. <br /> Approved 1L25/02- Existing door to remain, and additional opposing-s�ving <br /> Door R346 added. <br /> C 9 � Provide medical gas zone valves for critical patient care areas. <br /> Approved l l/21/02-Ba�ed on drewings received 11I01102,which show locations <br /> of required zone valves. <br /> C ]0 0 Provide separate room for toilet in wing 3C. <br /> Approved 1?!03/02-Based on drawings received 11/Ol/02,which show separate <br /> toilets in each room. <br /> C 11 � Provide reduced pressure backflow pteventer for dialysis machine connection. <br /> Provide a detail of ciialysis boxes. <br /> Approved 11/15/02-Approved tixed air gap provided on dialysis box. <br /> C 12 0 Provide 20-minute doors for nurse servers serving wing 4A. <br /> Approved 11/25/02- Wing 4A not part of this project. <br /> Pagc 4 of 1 I Plan Review Comments for Project#6345 <br /> Review Kcy: A=Archiiccl F=Fire&Life Safe�y 5=Snnitarinn M=Mtthanical!Electrical C=Conference Note <br /> rr <br />