Laserfiche WebLink
' 10. Specify length of �^hor bolts 7" min. ernbedment min. 2�:-�ch piece and within 12" <br /> of each end of eac�. ,ecc. Provide 2" x 2" x 3/16" piate , .sher on all anchor bolts. <br /> 11. The basement foundation wall detail (� on sheet S-1 shows both parallel and <br /> perprndicular joists. but dces not call out blocking required for parallel joist <br /> condition. Provide detail. <br /> 12. Foundation walls enclosing a basement below finished grade shall be damp proofed <br /> outside by approve method and materials. (UBC 1402.4). <br /> 13. Specify construction of built-up beams. <br /> 14. Provide detail of rafters at top plate. Show solid blocking, insulation baf}le and � <br /> connection of trusses to top plate. � <br /> 15. Provide smoke detectors in all sleeping rooms and in the cottidor or area giving <br /> access to each separate sleeping area. Detectors shall be installed on each floor and <br /> in basements. Detectors shall be hard wired and interconnecred. Detectors shall <br /> have a battery backup. <br /> ]6.lnsulate rim joist to same level as exterior walls. <br /> 17. All guardrails shall have intermediate rails or ornamental pattern such that a sphere <br /> 4" in diameter cannot pass through. Show on guardrail details. <br /> 18. Provide interior and exterior stair details showing all components, fire blocking and <br /> one-hour construction (5/8" type `x' on soffit and walls of useable space under stavs. <br /> ]9. The door that accesses the attic storage over .he master bathroom is part of the <br /> exterior envelope and needs to be an exterior door. <br /> 20.The plans and section show scissor trusses over the master bathroom in the area <br /> where Ihe fumace and water heaters are located. Please clarify. <br /> 21. Provide cross sec[ion in the area where Ihe roof framing s[arts at the first floor top <br /> plate, showing the actual configuration of the roof (8:12 pitch). The section should <br /> be similar to section 'AA' on shect N7 of 8. The second floor plate will need to be <br /> towered, or the first floor plate will need to be raised. Section should show all <br /> conswction specific to this strucmre. <br /> Please provide a response letter showing wherc each item in this correction letter is <br /> addressed on the plan set. <br /> Upon resubmital of the drawings, your application will be given priority and plan review <br /> will commence. <br /> All required submittals shall be of sufficient detail and contain sufficient information to <br /> ensure that the proposed strucC�re will be constructed in compliance with all adopted <br /> codes. <br /> Sincerely, <br /> �� <br /> Jeff He' man <br /> Development Technician <br /> IH:jcC0101�015 <br /> � <br /> Z/v <br />