My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1515 COLBY AVE 2018-01-02 MF Import
>
Address Records
>
COLBY AVE
>
1515
>
1515 COLBY AVE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2022 3:25:04 PM
Creation date
1/26/2017 11:11:44 PM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
1515
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� �6un rarxena � �' _ _ <br /> � <br /> DATE July 29, 1971 I � _ � <br /> ' � •_7 <br /> bUBJECT pacific and Colby Building QTY OF [VER[TT. EVERETT. WASHINGTON w,�, _ <br /> Enclosed ia a copy of Lhe requirements of the exit facilities from Mr. Walt Cooper, <br /> Fire Marchal. Refering to them in the same order, the vork ahall be completed in <br /> the following phases. <br /> , 1, When the suite now occupied by Dr. Bitar ie leased. <br /> 2. With preeent phase. <br /> 3. If a fire eacape is provided for item 2 above, the fire eacape ahould <br /> continue in the present phase to the 3rd floor. Exiting thru window of <br /> 3rd floor will be permitted at present. Doore to exit windov ahould be <br /> unlocked during any time third floor ia occupied, <br /> 4. Illuminated exit signa should be inetalled in preeent phaee for all exite <br /> betng used currently. <br /> � 5. As required for 50 occupanta. <br /> 6. Should be corrected during present phase. <br /> 7, Window on second floor should be changed to a door during present phase. <br /> Window on third floor to be changed to a door vhen ever any remodeling ie <br /> done on 3rd floor. <br /> 8. Should be corrected during preaent phase. <br /> 9. To be encluded when work in item 1 ie conetructed for the basement area, <br /> � Second floor to be encluded in present phaee. See item 6. Third floor <br /> complies. <br /> 10, To be included when item 1 ie conatructed. <br /> 11. To be included when item 1 ie conatructed. <br /> � 12. As it applies to the varioue phasee of the work. <br /> I 13. To be included in present phaee, <br /> � <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.