My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1722 COLBY AVE 2016-01-01 MF Import
>
Address Records
>
COLBY AVE
>
1722
>
1722 COLBY AVE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2017 11:50:40 PM
Creation date
1/26/2017 11:50:08 PM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
1722
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_ J <br /> CLOSED CK AORR ORDERB REPORT <br /> Total Utility Maintenance Management System <br /> 03/28/1995 Page 1 _ <br /> ____________________________________________________________________________��_ <br /> ---------------------------- <br /> Date Range :O1/09/1989 - 03/24/1995 <br /> CM Work Order Range : 1001091070001 - 8801086100085Pattern :7401'L96751170 � <br /> Item Ranqe :<Blank> - WW22020001 Pattern :* <br /> Program ALL Function ALL Activity ALL <br /> ____________�___________________________________________________________________ <br /> CM WORK ORDER ID: 7401196751170 Title: CONVERT 1722 COLBY pV� <br /> «pUPLICATE PRINTING OF THIS WORK ORDER» <br /> Item ID: WS1895Z055 -- WATER SERVICE <br /> Location ID: -- <br /> Program 740 Function 119 Activity 675 <br /> Date Completed: 03/24/1995 <br /> Overall Craft: <br /> Zssued: 03/22/1995 Issued by: SKL Assigned to: WUT <br /> out of Service? NO Priority: Travel Time: 0. 00 Hr. <br /> Meter Reading: <br /> Downtime: 0 hours <br /> Status: <br /> Labor: <br /> Craft ID Name Planned Hrs Actual Hrs Cost <br /> ----- ------ ------------------------------ ----------- ---------- ---------- <br /> UL IMA LISBING, MAURZCE A. 0. 00 3.00 44.49 <br /> WST TDE1 THOMPSON� DWAYNE E. 0. 00 3.00 49.05 <br /> Total Labor Cost: 93.54 <br /> Materialss <br /> ID Description Date # Used Cost <br /> ------------ ------------------------------ -------- -------- ---------- <br /> ADAP34000347 ADAPTER 3/4" CS`1' X INSTA-TITE@ 03/24/1995 3 22.44 <br /> ADAP34000647 ADAPTER 3/4" FIP X INSTA-TITE@ 03/24/1995 1 7. 00 <br /> BOX000056247 BOX METER PLA 15" X 10" W/LZD . 03/24/1995 1 12. 27 <br /> METE36089447 METER 5/8" X 3/4" NEPTUNE T-10 03/24/1995 1 27.84 <br /> PIPE34060647 PIPE 3/4" POLY I.P.S. 03/24/1995 5 1. 20 <br /> VALV34008648 VALVE METR 3/4" L/W FLARD ��OP@ 03/24/1995 2 21. 06 <br /> Total Material Cost: 91.81 <br /> vehiclea: <br /> ID Description Hours Coe.t <br /> ------------ ------------------------------ ------ ------�---- <br /> V2146 87 CHEV 1 TON W/HYD. UNIT 3.00 15.30 <br /> Total Vehicle Cost: i5.30 <br /> Work Description: . <br /> -------------------------------------------------------------------------------- <br /> METER# 40304477 <br /> Total cost for work order 7401196751170: 200. 65 <br />
The URL can be used to link to this page
Your browser does not support the video tag.