My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2405 COLBY AVE 2018-01-02 MF Import
>
Address Records
>
COLBY AVE
>
2405
>
2405 COLBY AVE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2020 7:25:07 AM
Creation date
1/27/2017 1:47:46 AM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
2405
Notes
EVERETT HIGH VOCATIONAL
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br /> Legal Description <br /> MONITOR ADD BLK 551 D-00 BLK 551 TGW VAC ALLEY LY WI7HIN SD BLK PER ORD 64G-79 <br /> 28 NCL &�TGNLALL BLKS 552T& 553 ALSO TGW OTS 3 THRU 20 ELK 489 SDLPLAT,OF EVU <br /> TGW ALL TN PTtJ VAC 24TH ST & TH PTN VAC ALLEY ABTG SD BLK 489 PER CITY OF EV <br /> ORD NO 1448-88 REC AF NO 8602190424 &ALSO TGW VAC ALLEYS LT WHN BLKS 552 & <br /> 553 OF BOTH PLATS PER CI7Y OFEV COUNCIL RECORDS DATED JUNE 5,1899 �: PER ORD <br /> NO 960 DATED OCT 21,?908 <br /> Description of Work <br /> . Energy upgrades to buildings located at Everett High School. The buildings included are <br /> the Administration Building, Science Building, Vocational Building and Commercial <br /> Buiiding. <br /> • A� d�inistration Building work includes but is not limited to the addition of two new boilers, <br /> �nd the replacement andlor upgrade of light fixtures. <br /> . ��ierrce Building work includes the removal and replacement of existing roof top <br /> mechanical units, replacement and/or upgrade of light fixtures,-removal and— <br /> replacement of suspended ceiling and a re-roof. <br /> . V onal Building work inciudes the replacement and/or upgrade of light fixtures, and <br /> ��emoval and replacement of existing classroom unit ventilators. <br /> • Co mercial Buiiding work includes the removal and replacement of existing classroom <br /> nit ventilators. <br />
The URL can be used to link to this page
Your browser does not support the video tag.