My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2501 COLBY AVE 2016-01-01 MF Import
>
Address Records
>
COLBY AVE
>
2501
>
2501 COLBY AVE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2017 2:23:07 AM
Creation date
1/27/2017 2:22:21 AM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
2501
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
;�,._ - _ ■ <br /> ' REPAIR SP�FICATIONS AND LIST .OP WORn TO BE BID <br /> Page �: � �`1�`� <br /> Address; 2501 Colbv <br /> 7. Floor Coverinas Nail down 1/2" particle board <br /> underlayment over all kitchen floors in all apartment <br /> units except units #8, 1Q, 13 and 16. Use ring shanked <br /> nails with spacing as recommended. Install 1/2" plywood <br /> underlayment over all bathroom floors where the pine <br /> board underlayment is uneven and showinq through the <br /> existing floor covering. Tubs and toilets to be <br /> lifted. Glue down vinyl, Armstrong Castillian #69490 or <br /> equaZ,- to all kitchen and bathroom underlayment. G.lue <br /> ilown the same vinyl over existing linoleum in all <br /> remaininq bathrooms in the building e:scept in units 8, <br /> 10. 13 i 16. Add baseboard to complete job. Diacuas � <br /> type of base with the owner. <br /> Inatall 1/2" rebond pad to all remaininq floor areas in <br /> all the same apartment unita as new vinyl is beinq <br /> installed. In addition, add the same padding to all <br /> building hallway floor areas, with the exception of the <br /> main floor and basement hallways. Ins�al? 26 oz. 1009 <br /> nylon carpet, J.P. Stevens "Necessity" carpet or equal, <br /> over a11 newly padded unit floor areas. Install 20 oz. <br /> commercial qrade (no vegekable backing) carpet, <br /> Inteqrity or equal, to the second and third floor <br /> hallways, and glue down the same to the basement hallway <br /> concrete floor. Finiah with base and moldings as <br /> necessary to complete. Discuas type of base to be used <br /> •with owner pcior to bidding. <br /> Contractor is responsible to cut all door bottoms where - <br /> neceasary to clear new flooring. <br /> s��D Q .. <br /> i ALTERNATES (Please include � the tax 3n each item amount. Do <br /> � not nc ude the price of the items below in the total bid <br /> amount.) <br /> l. Windows All new window units in this item shall be <br /> dura bronze aluminum insulated glass units, Milgard or <br />� equal: All opening units to be installed with acreens. <br /> iWest aide (front) windows. Replace the following: both <br />� bays to have raw units on each side (8 windows) and <br /> sinqle hunq replacement units in the center of each bay <br /> (4 windows) ; the lar9e window immediately below each bay <br /> to have single hung replacement . units; and the two <br /> groups of three windows on each side of the front stepa <br /> to have the center windows replaced with single hung <br /> replacement units and raw units on each side of the <br /> center windows. . <br /> South side windows. Replace the fo�-bowi�ng: ttuee_ bays <br /> to have .raw units on sides of each bay (12 windows <br /> total) and single hung replacement units in the centers <br /> (6 windows total) ; the three small windows at each end <br /> of wall to have raw units (6 windows) ; all of the <br /> . windows between the bays (12 windows) and windows <br /> immediately below each bay (3 windows) to have single <br /> hung replacement units; and replace all of the remaining <br /> windows in the same wall except the laundry room <br /> windows, with single hung replacement units. The <br /> laundry r4om to have raw .units with wood fcane wc,rk <br /> built across the bottom of one unit to allow <br /> installation of dryer vent. <br />
The URL can be used to link to this page
Your browser does not support the video tag.