My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2814 COLBY AVE 2016-01-01 MF Import
>
Address Records
>
COLBY AVE
>
2814
>
2814 COLBY AVE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2017 7:00:17 AM
Creation date
1/27/2017 6:59:06 AM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
2814
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
151
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� i <br /> ' ` ENG/NEER/NG/ PUBL/C SERY/CES OEPA/lTiNEMT <br /> � <br /> April 16, 2007 <br /> Mr. Adam Clark <br /> Gary Parkinson <br /> 2812 Colby <br /> �vcrett, WA 98201 <br /> R�: Owner: Pull Gospcl Mission Church <br /> Job Address: 2814 Colby <br /> Plan Check No: I30704-022 <br /> n� , � �� v�,d'� <br /> Dcar Adam, <br /> [n response to your application for a conslruction permit, your plans have becn examincci and <br /> you are advised tliat the issuancc of a permit is bemg wi�hheld for the reasons listed below. <br /> These comments address building issucs only. Addmonal rcvisions, or additions, may bc <br /> rcquired by other dcpartments (sudi as Utililies, Planning or Pirc). All references refer to the <br /> 2003 International BuilJing Cocle, as amended Uy the State of Nashington and adopted by dic <br /> City of�verctt and thc Nashington State Lnergy Code, 2004 Edition, unless stated otherwise. <br /> [n order for flie processing of your application to continuc, it �rill be necessary to provide <br /> the I3uilding Division with t�ro complete new sets of dra«�ings retlecting the corrections <br /> requcsled. <br /> l. The submitted details do not include sufficient in(ormation for a swctural plan check. <br /> Dctail 5 indicates a new steel column supportcd Uy an existins wooci beam. 1'he <br /> calculations do not includc any analysis for the existing wood beam. Are therc existing <br /> wood columns at all of the proposed stcel column locations? Perhaps a scliematic <br /> diagram would help to clarify thc scope of this project. Analysis of the wood beam <br /> may also be requireci. <br /> Upon resubmittal of U�e drawings, your application will Ue given priority and plan review will <br /> recontmence. <br /> All rcquired submittals shall bc of sufticicnt detail and contain sufficient information to cnsure � <br /> that the propos d structvre will Ue constructed in compliance with all adopted codes. <br /> SincerelY, _..�-- <br /> !� <br /> ✓ , <br /> Stcve Miller <br /> Associate Gngineer <br /> CITY OF EVERETT • 3200 Cedar Street • Evereri, WA 98201 • (425) 257-8800 • Fax (425) 257-8856 <br /> rn�rn riNcr:nrsra��nouiR.00ivaou aeid t�n.ori <br />
The URL can be used to link to this page
Your browser does not support the video tag.