My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2814 COLBY AVE 2016-01-01 MF Import
>
Address Records
>
COLBY AVE
>
2814
>
2814 COLBY AVE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2017 7:00:17 AM
Creation date
1/27/2017 6:59:06 AM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
2814
Imported From Microfiche
Yes
该页面上没有批注。
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
151
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br /> PU�►L/C /�f/O/�K� <br /> ENG/NEER/NG/ PUBL/C SERI//CES DEPARTMENt <br /> rfTT <br /> January '_'2, 2003 <br /> blanuel Pereira, A[A <br /> r\bsher Conswction Compan} <br /> P.O. Box 280 <br /> Puyallup. WA 98371 <br /> ProjecC Pull Gospcl Missiun Church <br /> Job Address: �'31�3 Colby Stmct <br /> Plan Revicw No: D030I-0Ol <br /> Dear �1r. Pcrcira: <br /> In response to your application for a conswction permit, your plans have been examincd and you <br /> are advised that the issuance of a pcilnit is bcing withhcid for tlie masons listed bclow. Thcse <br /> comments address building issues only. Additional revisions or additions may be rcquimd by othcr <br /> departmcnts (such as Utilitics. Planning or Fire). All refercnces refer to the 1997 Unifonn Bulding <br /> codc, as amended by thc State of �V�shin�ron anci/or ihc Washington State Gnergy Code, 2001 <br /> edition, unless noted othenvise. <br /> This review does not cover submitted mechanical, sprinkler, electrical or plumbing documents — <br /> these pennits must be obtained separatcly and may rcyuirc furthcr review and submission of plans. <br /> In order for the prucessin� of your application lo cnntinue, it ���ill be necessary lu provide the <br /> E3uilding Uivision �vith hco complete new sets of drawings retlecling the currcctions rcyuesled. <br /> NON S1'RUCTUILIL <br /> 1. The change of this building to assembly use requires an elcvator to be installed per Sections <br /> I 103?.2, l 105.3.1.1 & 3�OS. As this cun�ent improvcment only utilizes the main Floor [he <br /> requirement for the elevator will be postponed until thc basemcnt anci/or the second floor are <br /> utilized. <br /> 3. An architect licensed by the Statc of 1Vashington should stmnp thc plans. Section I06.3? <br /> 3. The tluors of the toilct rooms should be shown to be smooth, nonabsorbcnt surfaces such as <br /> Portland cement, concreta ccramic tile or othcr approved malerials th�t extend upward unto <br /> the walls at least 5 inches. Section S07.1 <br /> 4. The doors from the st.�ir enclosures should be noted to have �450-dc�rec maximum <br /> temperaturc risc labels. Section 1005.3.35 <br /> 0 9 . or , � �S_ /� <br /> Cll'Y CF E'JFR6TT • 32C0 Cedar Street • Everett. WA_.8_01 (425) ��7-�'S00 Fax (d�5) �_�-885h <br />
The URL can be used to link to this page
Your browser does not support the video tag.