My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2910 COLBY AVE 2016-01-01 MF Import
>
Address Records
>
COLBY AVE
>
2910
>
2910 COLBY AVE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2017 8:10:54 AM
Creation date
1/27/2017 8:08:09 AM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
2910
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
259
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I T11 l �{�/ <br /> • n al � Vll \Ar'•�l i�"� rr/jM y � . <br /> /1 ' , � i <br /> RECEIVED <br /> USPERMIN2,TION F�NON-SIGNIFICI.NCE TME pY FM� S 199� <br /> A�Y ARCH/TFCl3 <br /> SEPA �k63-91 <br /> Colby Place Mixed-Use Development <br /> DESCRIPTZON OF PROPOSAL: The proposed request is for the issuance of <br /> Building and Public Works permits to allow for the construction of a <br /> new five (5) floor, 12,400 square foot mixed-use building addition <br /> between two existinq commercial buildings. The new building will be <br /> sited on the vacant lot between the former Fidelity Bank and Chaffee <br /> buildings on the southwest corner of Hewitt and Colby Avenues. The two <br /> ground floors of the building will provide retail/office spaces, while <br /> the third floor will provide a residential apartr�ent unit, with <br /> owner-occupied townhouse residential unit on the fourth and fifth <br /> �locrs. Four (4; r.ea parking sraces caill b� provided in the basement <br /> floor, this will be in addition to the existing seven (7) parking <br /> stalls off the alley, one of which will be converted to a <br /> loading/off-loading stall for the retail space. Principal vehicular <br /> ingress/egress will be off the alley, while the main residential and <br /> pedestrian access will be through two separate entrances on the Colby <br /> Avenue building frontage. Both the former Fidelity Bank and Chaffee <br /> buildinq are otaned by the applicant. <br /> P��N�T� Mr. Chuck Ogden, AIl,. For Art Skotdal <br /> The Dykeman Architects <br /> 1602 Hewitt Avenue <br /> Everett, WA 98201. Phone 259-3161. <br /> IACATION: SW corner of Hewitt and Colby Avenues, Everett <br /> ZONING: B-3: Central Business District <br /> G� P� ��IG: 3.2: Central City/Retail Core <br /> L� �G��� City of Everett Planning � Community Dev. Dept. <br /> �I'�Ta�T P�ON: Justin C. Osemene Phone: 259-8731 <br /> HitiQation D[ .Aure •• <br /> The environmental impacts of this proposal are documented . in the <br /> Environmental Checklist and other information on file with the City. <br /> The listed requirements are pZaced in response to our review of this <br /> information: <br /> AGENCIES FTITH JIJRISDICTION: None <br />
The URL can be used to link to this page
Your browser does not support the video tag.