_ � . _Y-.�
<br /> ' ( �.
<br /> SOUND ELEVATOR COAlPANY 1/'ORK NOT INCLUDED
<br /> This proposal dces nol include lhe following work,anC is condilioned on the proper peAortnance ol svch work by Ihe Purchaser,General Contrador,or olher
<br /> Subcontractors:
<br /> 1. A legal hoistway,properly framed and endosed,and induding a ptt of proper depth provided with ladder,lights,actess doors,and walerproofing,as
<br /> required. A suitable machine room adequale for the ekvator equipment,incJutling Boors,gretings,foundations,lighting,ventilation and heat to
<br /> maintain the room at an ambient temperatum ot 57'F minimum to 700'F inaximum(90'maximum on Dover TreBomatic II,111 and N controls for
<br /> Iraction eievators).
<br /> 2. If appliwbte.:well hole with casing of proper size and deplh as direded by Eievator ConVaCor,located and fumished by General Contredor.
<br /> 3. Adequate supportt�and foundalion lo wrty tha toads of ali equipment,including suppoAs for guide rait brackels. If hoistway is more lhan 72"wider
<br /> thai suppliers scandartl recommendations,lhen Generel ConUactor is to fumish addRional support lor guida raii breckets as required. If adjacent
<br /> hoishvays are util¢ed,divider beams at suitable poinls shall be provided for guide reil bracket support. Guide rail brachet inseRs provided by Elevator
<br /> ContraCor and installed by General Conlroctor.
<br /> 4. Coortlinate sct�eduling oi maehine room slab work so that Ekvator ConUactor has adequate time to sel machine beams and blodc-0uts priar lo metai
<br /> decking or concrete placemen4
<br /> 5. Cutting oiwails,fioors;etc.,arni removal of such obsWdions as may be necassary for proper inslatlatlon of Ne ekvafoc Setting of anchors or
<br /> sieeves as provided by Elevator Contractor. Pakets or blodcouts for signal fiMures.
<br /> 6. Proper trenching and badefi�ling far any underground piping or conduA.
<br /> 7. A�I sill supports,induding sleel angles where required,and sill recesses and Iha grouting of door sills and hoislway frames afler Installation. Finish
<br /> drywall nol lo be installed until afler door frame set In place.
<br /> B. Door frames with exlensions lo beam above if required on hoishvay side and sills for freighl elevators,Induding finish materials and painling of these
<br /> items.
<br /> 9. F�mishing,instailing and malnlaining the required fira raling ol ekvator hoisAvay wa115,induding the penetration of fire wali by ekvator fature boxes.
<br /> 70. Proviac and maintain temporary enclosures or other proledion from open hoistways during the tirtro the elevalor is being insWlled.
<br /> 11. All painting,except as olherwise spacified.
<br /> 12. SuAabie connedior,s from Ihe power mains to each controlkr,InGuding necessary cirwit hreakers or fused mainline dis�ronnect swilches,each
<br /> discanned to be provided with a dediwted ground,par NEC,A�iGe 250. Disconnects to hevo shunl�rip when machine room is sprinkied(shunl shall
<br /> not be self-reset'�ing)..Separete disconnect in machine room for 720 Voll,single phase pawer to the ekvator controlkr for lighling the wr. Elecirie
<br /> power,without u�arge,for construdion,feslinp,and adjusting,of ihe samP aharaderistics as the pertnanenl supply. DismnneC musl be lockable in
<br /> the OFFlOPEN position onty,per NEC Artide 620.5J. All 725 voR,sin3le-phase 15•and 20.amp receplaGes installed in the machine rooms,
<br /> machinery spaces,pits and circuits to elevator car tops shall have g�ound lault Urcud-intertvpter proleCion,per NEC ArtiGe 620-85.
<br /> 13 If required,fumish and inslall the necessary iransfer switches wflh auxiliary conWCs as needed from nortna�to emergenry suppty on the elevator
<br /> feeder and winng as specified in lhe eledriwl section of the specificatians from lhe lransfer switches to the elevator cbntroller. (Specify number of
<br /> elevators required to operate under emergenry povier).
<br /> 14. My mnduits and pull wires behveen machine room and any olher point outside lhe machine room or hoisAvay or behveen machine rooms.
<br />, 15. If the battery Iowenng option is taken,each elevator is reauimd to have an isolated set of dry contaRs on the disconned switch(provided by others)to
<br />, prevent the car from lawenng H the disconneG is ihrown. The auxiliary contact shall be configured as SPST and be reted al no less Ihan t A at 10
<br /> VAC. The auziliary contact shall be open whan the disconnect switch is in Ihe open position. If a shunl lrip dreud bRaker is provided,an auxiliary
<br /> contaC shalt a�so be installed on tha arcuft breaker. Others atso provide hvo 78�gauga wires from the auziiiary swdch to our controiler(i.e.,switch
<br /> open,dry wntaC open).
<br /> 76. Heat and smoke sensing devices at etevator lobbies on each Aoor and in machine room with eiedriwl condudors terminaling at a properly marked
<br /> panel in ihe elevator machine room.
<br /> 17. Outside te�ephone line to be provided by others. InstNmenl by Owner,unless othenvise specified, E;evator Cantndor to fumish wires in the traveling
<br /> wble for telephone hook•up to a 24fiour answering service. Nole that an automalie dial telephona must have emergenq power provisione ir.order
<br /> to operate and that phane system must meel ihe intent of Ihe A.D.A.law(eRedNe 127/92).
<br /> 78. Any govemment-required safety provistons not directty invoNed in lha eievator installation.
<br /> �,� 79. Temporary elevator service pnor ta complelion and acceptance of complete installation,hased on Elevalor Contradors Temporary Acceptance Form.
<br /> I
<br /> :sb 1WORDDOCStSTEVE3/EverettTheaterlbid.doc Rev.5R6/97:hjk \WORDDOCSWIASTER515CP•HLS.DOC
<br /> 40F5
<br /> i
<br />
|