Laserfiche WebLink
5 <br /> 12/24/03 <br /> report will also include an assessment of how either raising or lowering the depth of the <br /> intake structure would affect the temperature, and abundance and size distribution of <br /> particles in the water removed from Lake Chaplain throughout the year. After this initial <br /> report has been reviewed and commented on by City of Everett personnel, the Contractor <br /> will prepare a final draft report that fully addresses City comments. <br /> 18 <br />