Laserfiche WebLink
CLOSED CM WORK ORDERS REPORT <br />Total Utility Maintenance Management System <br />07/15/1997 Page 2 <br />Date Range :12/03/1900 - 07/01/1997 <br />CM Work Order Range :1001091070001 - PW2548-19- Pattern :7101096750304 <br />Item Range :<Blank> - WVL3694L05 Pattern :* <br />Program AIL Function ALL Activity ALL <br />CM WORK ORDER ID: 7101096750304 (contin"cd) <br />REDU44303347 REDUCER 6" SP X 4" GASKETED 06/18/199.7 2 9.52 <br />WYEO44303947 WYE 6" ALL GASKETED 06/18/1997 1 10.48 <br />Total Material Cost: <br />Vehicles: <br />ID <br />Description <br />Hours <br />------ <br />---Cost--- <br />------------ <br />V0010 <br />--------------- <br />'92 <br />--------------- <br />GMC S10 PU <br />6.00 <br />32.40 <br />V0017 <br />94 <br />FORD AEROSTAR VAN <br />2.00 <br />11.60 <br />V1502 <br />90 <br />ESCORT WAGON <br />8.00 <br />42.40 <br />V2112 <br />91 <br />CHEV 1 TON <br />5.00 <br />26.55 <br />V2113 <br />91 <br />CHEV 1-TON <br />2.00 <br />10.60 <br />V2152 <br />87 <br />DODGE W/HOIST <br />16.00 <br />76.80 <br />V2225 <br />88 <br />FORD 8YD <br />5.00 <br />76.80 <br />V2231 <br />90 <br />FORD DUMP 5-YARD <br />8.00 <br />83.20 <br />V2663 <br />87 <br />VACTOR <br />2.00 <br />95.40 <br />V3200 <br />80 <br />CASE VIBROMAX W25 ROLLER <br />5.00 <br />98.60 <br />V3507 <br />88 <br />CASE BACKHOE 4X4 <br />8.00 <br />295.20 <br />V3603 <br />86 <br />CASE BACKHOE 780 <br />8.00 <br />316.80 <br />V6401 <br />80 <br />CASE FLATBED TRAILER <br />5.00 <br />0.00 <br />V6807 <br />89 <br />COMPRESSOR TR <br />16.00 <br />76.80 <br />VJ0002 <br />93 <br />INTERNATIONAL 10 YD <br />16.00 <br />342.40 <br />VJ0017 <br />'96 FORD 5 YARD <br />5.00 <br />73.75 <br />Total Vehicle Cost: <br />Work Description: <br />----------------------------------------•------- <br />REPLACED SIDE SEWER FROM MAIN TO PRGPEKTY LINE, MAIN IS <br />STANDPIPE IS 18" DEEP DEPTH AT PROPERTY LINE IS 6"DEEP. <br />MANHOLE SOUTH OF HEWITT IS 311' <br />538.61 <br />341 <br />57.E <br />1659.30 <br />9'6" DEEP TOP OF <br />NEW STATIONING FROM <br />Total cost for work order 7101096750304: 4162.69 <br />