My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3120 COLBY AVE 2016-01-01 MF Import
>
Address Records
>
COLBY AVE
>
3120
>
3120 COLBY AVE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2017 10:06:13 AM
Creation date
1/27/2017 10:03:02 AM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
3120
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
406
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' Puuuc weRxs DEenRrn�erir <br /> Utilities Division,3200 Cedar Strect `� �:`. <br /> _ � <br /> Everetl WA 98201 C� �i � <br /> 425-257-8800 ' �� � <br /> Receipt p Datc Paid <br /> � Cost of Vlork Ordcr 4,762.00 Work OrdcrN <br /> Cost of Service Or�er Scrvice Order M <br /> Contact Person Chuck ORden Telephone N 425 742-1930 <br /> Requested By Paul McKee Date of Request 9-4-pQ <br /> Ptoperty Owner(nsme) <br /> Charge Cost to(name if dif(emnt than owner) <br /> Address 2910 Colby Ave, N200 Cicy Everett Zip g82pt <br /> Installation Location 3120 COlby AVe <br /> InstallaHon type/description/si.>.e/etc. pi —3"domestlC BervlCe. Ezpose maln in Colby instell <br /> tapping sleeve and control valve. Make hot tap and extend to contractor installed pipe. Install <br /> meter and bypass in contractor supplfed and piped throuqh vault. Make tinal connection after <br /> purity. <br /> ❑ The following estimate is�ased upon the Utilities Division providing all labor,equipment, <br /> materials,restoration,and final hook-up. <br /> Please notifv the Citv of Everett Utilities Division 10 working days in advance of required installation <br /> I date to allow for scheduling and �rarts vrocurement <br /> Whenever lhe estimated cost is not sufficient to cover the total expense for labor,material,equipment renWl and <br /> administrative costs, the deficit shall be charged to the propeRy for which such installation was made and the <br /> owner thereof, and provided further, that any excess payment shall be retumed la Ihe person applying for the <br /> installation. <br /> 'Deposit must be paid prior to ordering parts or scheduling work. <br /> WATER METERS 3"AND LARGER MAY HAVE A SIX TO 10 WEEK LEAD TIME <br /> Matcrial 3,436.00 cc Bldg. Permit CenMr <br /> Mark Sadler <br /> Labor and Benefits 836.00 Kirk Brooks <br /> Gordon Witchcr <br /> Equipment Rental 408.00 Rotxrt Waddle <br /> Tax g2,pp Matt Wclbom <br /> TOTAL Paul McKcc <br /> $4,762.00 Gerry Crum <br /> Alan Lockc <br /> Preparcd by: Ge�ry Crum e Estimate Preparcd 9•25-02 <br /> Accepted by: Representing <br /> FSTIMATE GOOD FOR 6 AtONTHS <br /> SNComma�hhinl`CuumlStauilUVC _��_ I/ <br /> � <br />
The URL can be used to link to this page
Your browser does not support the video tag.