My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3120 COLBY AVE 2016-01-01 MF Import
>
Address Records
>
COLBY AVE
>
3120
>
3120 COLBY AVE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2017 10:06:13 AM
Creation date
1/27/2017 10:03:02 AM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
3120
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
406
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� ' <br /> Publk Works Depardnent <br /> UHlitles Division,3200 Cedar Strat <br /> COST FSTIMATE SHEET Everett,Wra6fo`ton 98m1 <br /> (42�2S7•8500 <br /> Receipt # Date Paid <br /> � Cost of Work Order 1,087.00 Work Order #f <br /> Cost of Service Order Service Order M <br /> Contact Person Chuck Ogden Telephone # 425 742-1930 <br /> Requested By PsUI MCKle Date of Request 9-1-02 <br /> Propeny Owner(name) Skotdal Prlms Propertle� <br /> Charge Cost to(name if differcnt than owner) <br /> Address 2910 Colby Ave, M200 Cicy Everett Zip 98201 <br /> Installation Location 3100 Blxk Colby Ave—W Slde <br /> Installation rype/description/size/etc. _ KIII 5 exlsting domestic servlces on W. slde of Colby. <br /> ❑ The following estimate is based upon the Utilities Division providing all labor,equipment,materials, <br /> restoration,and final hook-up. <br /> Please noNfv the Citv of Everett Utilitics Division 10 workine davs in advance of reauired installation date to <br /> allow for scheduline and oarts urocurement <br /> Whenever the estimated cost Ls not sufficient to cover the total expense for labor, material, equipment rental �nd <br /> administrative costs, the deficit shall be charged to the property for which such Installadon was m�de and tMe owner <br /> tl�ercof,and provided further,that any excess payment shall be returned to lhe person applying for tl�e installaHon. <br /> ;Depnsit must bc paid prior to ordeting parts or scheduling work. <br /> WATER METER53�AN0 L4RGER MAYHAVEA SIX TO 10 WEEKLEAD TIME <br /> Material 200� cc: Bldg.Pcrmit Center <br /> � 2 Mark Sadlcr <br /> LaborandBenefits 697.00 �t���� � Hrooks <br /> on Wilchcr <br /> Equipment Rental 172.00 • � n waddle <br /> Tax 18.pp SEP 0 91002 ttwe�born <br /> - Paul McKce <br /> TOTAL $1,087.00 �jTy aF GertyCrum <br /> ..... <br /> Fnpinaonnoip�E���SRE RT ' Alan Lockc <br /> � <br /> Preparcd by: Ger Crum Ua[e Est. <br /> Accepted by: Prepared: Representing: <br /> 9-4-02 <br /> FSTIMATE GOOD FOR 6 MONTHS <br /> SWCommin4k�k��Mos�ettlStoi0ell'rime.0(�C �Of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.