Laserfiche WebLink
o EXHIBIT A <br /> SCOPE OF WORK <br /> 1. Deliverables: <br /> 1. Revise Programming and Office Standards for Police&Fire Administration <br /> 2. Revise Programming and Office Standards for Muni Courts <br /> 3. Diagrammatic Floor Plan-Wall Street Building <br /> 4. Diagrammatic Floor Plan—City Hall <br /> 5. Cost Estimate <br /> 2. Tasks: <br /> I. Workshops and a Walk Through to verify Programs (Use Previous Program Developed by DLR <br /> Group). <br /> 2. Updated Program with Modifications. <br /> 3. Preliminary Block Diagrams. <br /> 4. Work Shop with Everett Staff(two DLR STAFF). <br /> 5. Develop Selected Scheme. <br /> 6. Follow Up Meeting. <br /> 7. Final Modifications. <br /> 8. Cost Estimate(By Consultant). <br /> 9. Color Rendered site Plan for Presentation. <br /> 3. Assumptions: <br /> 1. City of Everett will supply Auto-Cad plans of the Wall Street Building. <br /> 2. Minor Changes To Space Program. <br /> 3 <br /> 9 <br />