Laserfiche WebLink
3 <br /> 4ETT <br /> CITY OF EVERETT <br /> PROFESSIONAL SERVICES AGREEMENT <br /> THIS AGREEMENT made and entered into on this day of , ,by and between the <br /> CITY OF EVERETT, a municipal corporation under the laws of the State of Washington,hereinafter <br /> referred to as the "City," and Robert W. Champion, whose address is 3802 Colby Avenue,Everett, <br /> Washington 98201,hereinafter referred to as the "Contractor." <br /> WHEREAS,the City desires to engage the Contractor to provide Architectural and Engineering services <br /> for the Police Headquarters, Second Floor West Wing Remodel Project,located at 3002 Wetmore, for the <br /> City of Everett; and <br /> WHEREAS, Contractor represented, and by entering into this Agreement now represents, that it is fully <br /> qualified to perform the work to be performed hereunder in a competent and professional manner; <br /> NOW,THEREFORE,the parties herein do mutually agree as follows: <br /> 1. Engagement of Contractor. The City hereby agrees to engage the Contractor, and the <br /> Contractor hereby agrees,to perform the work in a competent and professional manner and provide the <br /> services described in the attached "Exhibit A- Scope of Work". The Scope of Work so identified is <br /> hereafter referred to as"Work". Without a written directive of an authorized representative of the City, <br /> the Contractor shall not perform any services that are in addition to, or beyond the scope of,the Work. If <br /> the Contractor's proposal is attached as an exhibit,and if such proposal contains or incorporates any <br /> conditions or terms in addition to or different from the terms of this Agreement,then the Contractor <br /> expressly agrees that such conditions or terms are neither incorporated nor included into this Agreement <br /> between the City and Contractor. If, and to the extent,the Work includes the design of a public work or <br /> improvement, in whole or in part, Contractor's design shall be reasonably accurate, adequate and suitable <br /> for its intended purpose. <br /> 2. Intellectual Property Rights. Reports, drawings,plans, specifications and any other intangible <br /> property created in furtherance of the Work are property of the City for all purposes,whether the project <br /> for which they are made is executed or not, and may be used by the City for any purpose. Unless <br /> otherwise expressly agreed in writing,all intellectual property rights in such documents or intangible <br /> property created pursuant to this Agreement, or for the City of Everett,belong to the City of Everett. <br /> Contractor retains any intellectual property rights in documents and intangible property created by <br /> Contractor prior to engagement, or not created by Contractor for its performance of this Agreement. <br /> 3. Time of Beginning and Completion of Performance. This Agreement shall commence as of the <br /> date of execution of this Agreement and shall be completed by August 31, 2004. <br /> 4. Compensation. <br /> A. The City shall pay the Contractor only for completed Work and for services actually rendered <br /> which are described herein. Such payment shall be full compensation for Work performed or services <br /> rendered, including,but not limited to, all labor,materials, supplies, equipment and incidentals necessary <br /> to complete the Work. <br /> 5 <br />