My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004/02/11 Council Agenda Packet
>
Council Agenda Packets
>
2004
>
2004/02/11 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2017 10:46:23 AM
Creation date
1/27/2017 10:45:41 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
2/11/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETF CITY COUNCIL AGENDA ITEM COVER SHEET <br /> - PROJECT TITLE: <br /> Consent COUNCIL BILL# <br /> Preconstruction Contract with XX Action Originating Department Public Works <br /> Hoffman Construction Company as First Reading Contact Person Tim Marks <br /> the General Contractor/Construction Second Phone Number 257-8872 <br /> Manager, (GC/CM), for the Water Reading <br /> Pollution Control Facility Expansion, Third Reading FOR AGENDA OF Feb. 11,2004 <br /> Phase A Public Hearing <br /> Initialed by: <br /> Department Hear , <br /> CAA <br /> Council President <br /> Location Preceding Action Attachments Department(s)Approval <br /> Water Pollution Control Authorization to negotiate Contract <br /> Facilities a contract,Jan. 21,2004. <br /> Council approval of this agenda item authorizes a budget revision in the additional amount requested. <br /> Expenditure Required $ 268,900 Account Number(s): UP 2993-40 <br /> Amount Budgeted $ 1,800,000 <br /> Additional Required None <br /> DETAILED SUMMARY STATEMENT: <br /> The City Council authorized the Mayor to negotiate a contract with Hoffinan Construction Company to act as <br /> the General Contractor/Construction Manager(GC/CM) for the Water Pollution Control Facilities Expansion <br /> Phase A. Staff negotiated the Preconstruction Services contract with Hoffman. Staff recommends that the <br /> City Council authorize the Mayor to sign a Preconstruction Services contract with Hoffman. Staff also <br /> recommends that the City Council authorize the Mayor to negotiate a Maximum Allowable Construction <br /> Cost (MACC)once the drawings and specifications are approximately 80%complete. <br /> RECOMMENDATION Authorize the Mayor to sign the Preconstruction Service contract for the Water <br /> Pollution Control Facility Expansion Phase A in the amount of $268,900 with Hoffman Construction <br /> Company and authorize the Mayor to negotiate,with this firm, a Maximum Allowable Construction Cost <br /> (MACC),when the drawings and specifications are approximately 80%complete. <br /> 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.