Laserfiche WebLink
CLOSED CM WORR ORDfiRS REPORT <br /> Total Utility Maintenance Management System <br /> OS/27/1998 Page 1 <br /> ------------"'___________________________________________________________________ <br /> Date Range : O1/09/1989 - OS/13/1998 <br /> CM Work Order. Range :0810800810001 - IIT2830-30-322Pattern :7101196751456 <br /> Item Range :<Blank> - WVL3694L05 Pattern : * <br /> Prooram ALL Function ALL Activity ALL <br /> ________________________________________________________________________________ <br /> CM WORK ORDER ID: 7101196751456 Title: REPLACE 3316 COLBY AVE <br /> «DUPLICATE PRINTZNG OF 'THIS WORK ORDER» <br /> Item ID: WS3095J057 -- WATER' SERVICE <br /> Location ID: -- <br /> Program 710 Function 119 Activity 675 <br /> Date Completed: OS/13/1998 <br /> overall Craft: <br /> Issued: OS/11/1998 Issued by: WMW Assigned to: <br /> Ou't of Service? NO Priority: Travel Time: 0 . 00 Hr. <br /> Meter Reading: <br /> Downtime: 0 h�urs <br /> status : <br /> Labor: <br /> Craft ID Name Planned Hrs Actual Hrs Cost <br /> ----- ------ ------------------------------ ----------- ---------- ----- ----- <br /> WST TDE1 THOMPSON, DWAYNE E. 0 . 00 3 . 50 72 . 17 <br /> UL WTE WESTVANG, TERRY E. 0 . 00 3 .50 56 . 70 <br /> Total Labor Cost: 128 . 87 <br /> Materials: <br /> ID Description Date # Used Cost <br /> ------------ ------------------------------ -------- -------- ---------- <br /> ADAP34000347 ADAPTER 3/4" CST X INSTA-TITE@ OS/12/1998 2 16.42 <br /> ADAP34000547 ADAPTER 3/4" MIP X INSTA-TITE� OS/12/1998 2 16. 82 <br /> BCX000056247 BOX METER PLA 15" X 10" W/LID OS/12/1998 1 12 . 94 <br /> COUP34004347 COUPLING 3/4" MIP X COP ELL @ OS/12/1998 2 ? . 62 <br /> COUP34142747 COUPLING 3/4" CTS COMP X MIPTO OS/12/1998 2 8 .20 <br /> ELL034101447 ELL 3/4" 90 DEG HRASS " OS/12/1998 2 2 , 62 <br /> SETT34146547 SETTER COP 5/B" X 3/4" (H9" ) OS/12/1998 1 41.42 <br /> Total Material Cost : 106 . 04 <br /> Vehiclea: <br /> ID Description Hours Cost <br /> --- --------- ------------------------------ ------ ---------- <br /> VJ0026 ' 97 FORD 1 TON SVC TRUCK 3 .50 20 .65 <br /> ---------- <br /> Total Vehicle Cost : 20. 65 <br /> Total cost for work order 7101196751456 : 255 . 56 � <br />