|
�" -�
<br /> . r r
<br /> i
<br /> \ 4'
<br /> Jim Douglaa Condominium'
<br /> ` Page 2
<br /> J. VAN WALLFNDAEL — 7/3/79: Inapected resteel and WWF for topping elab; found all
<br /> per specs. Sampled concrete as folloxs: type I, 3000 psi, 6 sk, 7�8" eggregate,
<br /> supplied by Rosa Sand and Gravel and pumped at u 5�' slump. Weather, clear; temp,
<br /> 55 to 65 degrees. Caet 3 tesst cylinders, #19ABC, from the third t3 cubic yards load.
<br /> G. F. wII.SON — 7�6�79: Inspected resteol in brick walls, firat lift� fourttf floor
<br /> to rnof, aouth cnd east sides; third lift, third to fourth floor, west and north walls.
<br /> Also interior xalls, third to fourth floor. Snmpled type I� pea graval grout at a
<br /> fluid conaistency. Also eampled typo S mortar placed in firet lift, fourth floor to
<br /> roof� eouth, xe3t, and euat walls, at a workable consistency. Cast 3 u�ortar teet
<br /> cylindera, {1M19ABC; and 3 grout sarr.plos /{G19ABC. Mortar ie �ob mixed. Grout supplied
<br /> by Ross Sand and �rovel. Weather, partly cloudy; temp, 50 to 67 degreos.
<br /> G. N. SANDHC1tG — 7�9�79s Inapected resteel for first lift of walls, fourth Sloor to
<br /> roof for soutli half of building, and second lift, third to fourth flogr,efo�enpLeh
<br /> half of building. Supervised placement of typa I� 7 sk, 2000 psi� 3� EB B
<br /> �rout in tha valls. Grout suppliad by Ross Sand und Gravel and placed with Sluid
<br /> consisLency. Cnst 3 test pri.sms, #fG20ABC. Also sampled type S� 1800 psi mortar used
<br /> in second lift of rrnlla, four�h floor to roof for sauth half of building. Cnst
<br /> 3 te3t cyli.ndera, �2d20ADC. t•fortur is �ob mi�ced by Dizzard pfusonry ns follow3:
<br /> 1 part t :mont, -'� part lime, 3z Parts sand, 1 lb. Omicron per 100 lbs. cement. Ne¢ther�
<br /> partly cloudy; temp, 70 de�rees.
<br /> J. VAt1 FlALLII7DA�1. — 7�10�79: Inapected resteel nnd WWF for fourth floor topping slab,
<br /> north.,half of buildin�; found ull per ,pecs. Supervised plgcem�en�e�ato nsu tliedtb
<br /> locntiona mentioi�ed us follotias: type I, 6 sk, 3�0 psi� 7� gg C r. PP Y
<br /> R033 Sund nnd Grnvcl and placed nt a b" slump. ti•leather, overcast; temp� 60 to
<br /> �0 degroeo. Caat 3 te3t cylinders, �21AIIC. '
<br /> G. M. SntmDERG — 7/13/79: Inspected reateel for fir3t lift of wnlls, fourth floor
<br /> to roof� for no,th hnlf ef building. Supervised plucement of type I, 7 sk, 2000 psi
<br /> �rout in the xu113. Grout suPplied by Ross Sand and Gravel and pinced with fluid
<br /> consistency. Cost 3 tes!. specimens, 1fG22ADC. Also sampled type 5 mortnr u3ed in
<br /> fir3t lift walls� fourth floor to rooS, for north hulf of building. ltortnr is Sob
<br /> mixed bq Dizaard tia3onry as followa: 1 pnrt cement� � purt lime, 3� Parto snnd.
<br /> Cast 3 test specimenc �Fr1z2ADC. Plcather, partly cloudy; temp, 6!3 degrees.
<br /> G. P. YIILSON — 7�16�79: Inapected resteel for third lift of brick wulls, fourth floar
<br /> to roof� south half of buildin�, south, east tuid west walls. Alao interior Ct�fU ualls,
<br /> fourth floor to roof. Found nll per specc. Supervised plticement of 15 cubi� yards
<br /> grout ao follo�ra: 7 olc, type I, pea �rnvel with 12 oz�cu.yd. Pozz 3��, z000 psi
<br /> �rout cupplicd by Ross Snnd und Gravel and placed nt a fluid consistcncy. Also
<br /> snmpled type 5 mortar uaed in second lift of fourth floor brick wulla on north hnlf I
<br /> of buildin�� north nnd weat wnlls. Mortar �ob 'mixed by Dizzard Musonry n3 follows:
<br /> 1 part cement� �4 part lime� 3� Parts ,and. Cast 3 test specimenc /R�Sz3nDC. Grout
<br /> snmplea #C23ADC• 1'7cuther, clear; temp, 65 to 80 de�reos.
<br /> T. BEAN — 7�1f3�79: Inspected resteel for south h¢lf of roaf; found nll por specs.
<br /> Supervised placement o£ 492 cubic yurds of concrete as follows: 30Q0 psi� type I,
<br /> 6 �k, 7�g" aGGre�ute, cast 3 tr.,t cylinders �/22ADC nt 6^ slump.
<br /> G. F. HILSON — 7�20��9: Inspected resteel For finul lift of brick walls in north
<br /> portion of building, narth, south, east and rrest. Found nll per specs. Supervised
<br /> placement of 2000 psi, typo I, 7 sk, 12 oz�cu.yd. , pea gravel grout in all locations.
<br /> Grout supplicd by Ross Sand nnd Gruvel and pinced at a flaid consis4ency. Weathor,
<br /> clear; temp, 70 to CB dc�rees. Cast 3 test specimens, /f��4ABC; ;
<br />
|