Laserfiche WebLink
g EXHIBIT B <br /> Sheet 4-of 13 CITY OF EVERETT Contract No. 3076C <br /> Public Works Department <br /> Date: 6/5/03 CHANGE ORDER ESTIMATE Change Order No. <br /> ASPHALT CONCRETE TEMP. <br /> 74 PAVEMENT PATCH TN $30.00 (258.02), ($7,740.60) <br /> TYPE C, PRECAST TRAFFIC <br /> 75 CURB LF $13.50 (12.00) ($162.00) <br /> CEMENT CONCRETE <br /> 77 SIDEWALK SY $25.00 (494.88) ($12,372.00) <br /> CEMENT CONCRETE <br /> 78 SIDEWALK, STRUCTURAL SY $30.00 112.67 $3,380.10 <br /> 79 SKIN COAT SY $100.00 35.30 $3,530.00 <br /> 81 PAINT STRIPE LF $0.15 437.00 $65.55 <br /> 82 PAINTED GORE STRIPE LF $0.25 (17.00) ($4.25) <br /> PLASTIC CROSSWALK STRIPE <br /> 83 LF $1.60 290.00 $464.00 <br /> 84 PLASTIC STOP BAR LF $2.65 (65.00) ($172.25) <br /> 85 PLASTIC TRAFFIC ARROW EA $65.00 (3.00) ($195.00) <br /> 88 CURB STRIPING LF $0.65 (276.00) ($179.40) <br /> TOTAL ($116,957.19) <br /> .- <br /> 4. 3 <br />