My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004/02/25 Council Agenda Packet
>
Council Agenda Packets
>
2004
>
2004/02/25 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2017 11:32:52 AM
Creation date
1/27/2017 11:31:58 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
2/25/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET 9 <br /> PROJECT TITLE: <br /> Feasibility Study with ECS Consent COUNCIL BILL# <br /> Engineering, Inc. for Power X Action Originating Department Utilities <br /> Undergrounding at the Water Filter First Reading Contact Person John McClellan <br /> Plant Second Reading Phone Number 257-7214 <br /> Third Reading FOR AGENDA OF Feb 25, 2004 <br /> Public Hearing <br /> Initialed by: <br /> Department Head " A <br /> CAA rL_ <br /> Council President �, <br /> Location Preceding Action Attachments Department(s)Approval <br /> Water Filter Plant at Authorize action for ad Professional Services Utilities, Legal <br /> Chaplain Reservoir for consultant services Agreement <br /> Council approval of this agenda item authorizes a budget revision in the additional amount requested. <br /> Expenditure Required $38,500. Account Number(s): <br /> Amount Budgeted $500,000. <br /> UP 3200-1-650 <br /> Additional Required -0- <br /> DETAILED SUMMARY STATEMENT: <br /> Power outages due to trees falling on power lines have occurred at the Water Filter Plant. This adversely <br /> affects the operation of the Water Filter Plant. The Utilities Department wishes to study the feasibility of <br /> `undergrounding' the power distribution system at the plant. The feasibility study will assess the cost and <br /> effectiveness of several alternatives to underground the power. We plan to coordinate with the PUD to <br /> include their information in the feasibility analysis. This contract will generate a feasibility report discussing <br /> the various likely alternatives including cost estimates and local distribution layouts. <br /> RECOMMENDATION (Exact action requested of Council): <br /> Authorize Mayor to sign Professional Services Agreement with ECS Engineering, Inc. to conduct a <br /> feasibility study for Power Undergrounding at the Water Filter Plant in the amount of$38,500 <br /> 36 <br /> ,,Documents and Settings dliam\Local Settings\Temporary Internet Files\OLK4EUM-ECS Eng-2-25-04.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.