My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3430 COLBY AVE 2018-01-02 MF Import
>
Address Records
>
COLBY AVE
>
3430
>
3430 COLBY AVE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/8/2022 10:51:13 AM
Creation date
1/27/2017 11:32:59 AM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
3430
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� �, <br /> I <br /> I <br /> I <br />� CIT'. )F EVERETT - IIOARD OF ADJli NENT <br />� <br /> I` Minutes <br /> I <br />� November 5, 1979 <br />` The regular meeting of the Everett Board of Adjustment was held at <br />'� 7: 00 p.m. in the City Hall Council Chambers. <br /> Mr. Russell presided, Mr. Hoagland and Mr. Zook were present. <br /> Mr. Wilson and Mr. IIlack were absent. <br /> Mr. Russell introduced the Board members to the audience. <br /> Under old business a hearing was held on the application of <br /> Drenna Demmert, 14820 - 15th Avenue N.E. . Seattle, Washington, <br /> concerning permission to utilize a twenty (20) foot proposed <br /> non-revocable easement for ingress and egress. to serve a proposed <br /> Lot 3 of a proposed four (4) lot short plat located on the <br /> Northwest corner of 4th and Main Street in Lowell. adjacent to <br /> Interstate 5. <br /> Legal Description: Those portions of the Southeast quarter of <br /> the Southwest quarter of Section 32, Township <br />` 29 North, Range 5 East, �4.M. Remainder of <br /> ilegal on file. <br />� Approximate Location: N. W. corner 4th attd Main Street in Lowell - <br />� adjacent to Tnterstate 5. <br />� Zoning: R-2 Single Family I�igh Density Residence <br /> i <br />� At this time a memo from IIob Landles, the Lnvironmental Coordinator <br />� of the Planning Department, was read and these items were mentioned: <br />� 1. The SEPA process for the short plat has not been <br /> complet�d. <br /> i <br />` 2. There are problems on drainage, sewer, slope an <br />� noise that need to be addressed. <br /> I 3. The Planning Department suggests postponement on <br />� the project until the SEPA review has been completed. <br /> Carla Brose represented Drenna Demmert and made the following <br />� statements: <br /> I <br />� 1. They weYe lead to believe the environmental checklist <br /> applied at t}�e time that the building aoplication was <br /> submitted. <br /> I <br />�� 2. The property is designed for four duplexes. <br /> C . <br />�� . <br /> I <br /> 1 <br />� <br />, <br /> k <br />
The URL can be used to link to this page
Your browser does not support the video tag.