Laserfiche WebLink
„ <br /> 1 <br /> F <br /> I <br />� <br /> . i <br /> ... _..,. <br /> ; <br /> ,; � <br /> April 25, 1980 �7 � <br /> the Evercreen <br /> CITY OF <br /> everett <br /> Doi��ld L. Berkey, P•E• ��*• �"��. •'•'>•' <br /> Chief Distribution Engineer [Y[PCTT. W��NINGTON <br /> Snohomish County P.U.D. +•'�� <br /> ATTN: G. Nieborsky <br /> P.O. Box 11U7 <br /> Everett, WA 98206 <br /> Subject: P.U.D. Permi . #80�9J <br /> P.U.D. Work O er-�k087401 (U.G. 4019) <br /> Dear Mr. Berkey, <br /> Your application far a permit to iastall a portion of <br /> underground power system within the public right-of-way <br /> at 3430 Colby has been approved on 24 April 1980 as per <br /> � plans. <br /> Thr subject permit approval is based on the agreement <br /> that all work will be carried out in accordance with <br /> the City of Everett standards and American Publi.c Works <br /> P.ssociation specifications £or trench excavation and <br /> backfilling (Reference: Section 61, par. 3.05 and 3. 06) . <br /> All hard surface street crossings sha11 be by jacking, <br /> bo.ring or other preapproved construc�i�n methods. <br /> it will be the obligakion of the utility company to bear <br /> any costs that may be incurred intesting and confirming <br /> the requirement. <br /> The restoration of all landscaping and repairs will be <br /> comparable with its origizial condition and to the satisfaction <br /> of the City Engineer or t�is appointed representative. <br /> It will be your responsi;5ility to contact the City Bngineering <br /> Department (phone 259-SG11) immediately prior to starting <br /> construction. <br /> Sincerely, <br /> fiUGH YdARREi1, P.E. <br /> Director of Public Works <br /> BY: Je€f ,Kerwin <br /> Utility Inspector <br />