Laserfiche WebLink
� TO �OSTING �-�b-y� `� <br /> CLOSED Cti WORR ORDERS REPORT <br /> Total Utili.ty Maintenance Management System <br /> 10/30/1995 Page 1 <br /> -------------------------------------------------------------------------------- <br /> Date Range :O1/09/1989 - 10/27/1995 <br /> CM Work Order Range :1001091070001 - UT2608- - Pattern :7101196648575 <br /> Item Range :<Hlank> - WW22020001 Pattern :* <br /> Program ALL Function ALL Activity ALL <br /> -------------------------------------------------------------------------------- <br /> CM WORK ORDER ID: 7101196648575 Title: SO 1 INCH 3525 COLBY <br /> Item ZD: -- <br /> Location ID: -- <br /> Program 710 Fvnction 119 Activity 664 <br /> Date Completed: 10/24/1995 <br /> Overall Craft: <br /> Issued: 10/23/1995 Issued by: GJ Assigned to: <br /> out of Service? NO Priority: Travel Time: 0. 00 Hr. <br /> Meter Reading: <br /> Downtime: 0 hours <br /> status: <br /> Labor: <br /> Craft ID Name Planned Hrs Actual Hrs Cost <br /> ----- ------ ------------------------------ ----------- ---------- ---------- <br /> WST AGE ALLEN� GARY E. 0. 00 3.00 61. 11 <br /> EO CCL CRAIG, CHESTER L. 0. 00 1.00 18.67 <br /> LIL DMJ DOUCETTE, MARK J 0.00 3.00 44.49 <br /> SUP2 GJ GARZA, JOHN (NMI) 0.00 2. 00 49.30 <br /> HEO JRM JOHNSON� RICHARD M. 0. 00 3.00 59.55 <br /> UL SWU STENSETH, WOB URT 0.00 3.00 45.51 <br /> Total Labor Cost: 278.63 <br /> Materiais: <br /> ID Description Date # Used Cost <br /> ------- ------------------------------ -------- -------- ---------- <br /> ADAP36001047 ADAPTER 1" CST X INSTA-TITE @ 10/24/1995 2 25.56 <br /> BOX000045147 BOX M�TEF CONC W/STEEL LID 10/24/1995 1 106.96 <br /> CORP36002347 CORP STOP 1" CCT X COP @ 10/24/1995 1 12.89 <br /> COUP36006647 COUPLING 1" 1/8 BEND COPPER @ 10/24/1995 1 7.82 <br /> COUP36006847 COUPLING 1" COP X MIP ELL @ 10/24/1995 1 7.42 <br /> METE36089247 METER 1" NEPTUNE T-10 10/24/1995 1 82.30 <br /> PIPE36060747 PIPE 1" POLY I.P.S. 10/24/1995 1 0.43 <br /> SADD46018447 SERVICE SADDLE 8�' W/1" CCT 10/24/1995 1 13 . 13 <br /> SETT36033547 SETTER COP 1" (H15") 10/24/1995 1 78.80 <br /> Total Material Cost: 335.33 <br /> Vehicles: <br /> ID Description Hours Cost <br /> ------------ ------------------------------ ------ ---------- <br /> V0017 94 FORD AEROSTAR VAN 2.00 10.00 <br /> V2150 87 FORD 2 TON W/CRANE 2.00 12. 60 <br /> V2226 88 FORD DUMP 5 YARD 2. 00 21.60 <br /> V3508 88 CASE BACKHOE 4X4 2.00 40.80 <br /> Total Vehicle Cost: 85.00 <br /> .� .,� p �,�� <br /> - � <br />