My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3525 COLBY AVE 2018-01-02 MF Import
>
Address Records
>
COLBY AVE
>
3525
>
3525 COLBY AVE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2023 3:53:47 PM
Creation date
1/27/2017 11:59:54 AM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
3525
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
267
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
drain. Storm «�aicr dctcntion is not rcquircd for ihis sitc per Kirk Brooks, E�•crctt Public <br /> Works Dcpartmcnt. In licu of provi•;iing on-sitc dctcntion, a c;uh deposit will bc made to <br /> thc Ciry Capitol Improvcmcnt Fund No. 340 in accordance �eith City Ordinance No. 670- <br /> 80 for upgrading/crcation of city rc�;ional ddcntion facilitics, or olhcr rcgional drainage <br /> improvemcnts. <br /> Pm��isions to E�dudc P�llul�niti: <br /> Pollulants likcly to occur in thc siic dr�inagc arc yard ���astcs, fcrlilizcrs and smali amounts <br /> of oil from thc pavcd parking arcas. Thc catch basins upstrcam of lhc outlet pipe aill be <br /> provided with a sump, and the Iloatablc malcrial separator in CB 6 will act as a trap to <br /> collcct any oil or othcr Iloatablc polluCints. <br /> Draina��c Contml DurinE+Conctniciion: <br /> In order to minimize potential adverse impacts during construction, the contractor shall <br /> covcr embankments and dislurlxd surlaces ���ith mulchcs, plastic shceling or jute matting to <br /> control crosion during indement wcather. In adJition, the contractor shall erect a <br /> temporary filter fabric fence along the north, south, and east edges of lhe construction site <br /> and maintain it until construction is complcic. A tcmporary sedimcnt trap shall also bc <br /> constructcd at thc northcast comcr of the site. Refcr to Ihe Temporary Erosion/Sediment <br /> Control Plan, Shcet C5. <br /> Maintcnance: <br /> During cunslruclion, anJ uniil d�c siic is stabilired, thc cunu•actur shall providc perioclic <br /> maintcnancc ol thc crosion conlrol facilitics to cnsuro tha� �hcy continuc to function <br /> properly. Oncc conslruclion is camplctc, thc building maintcnanc:c staff shall, on a regular <br /> basis, inspect and dcan thc catch basins, arca drains and floa�able matcrials sepantor <br /> locatcd on thc siic. <br /> Pagc 2 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.