My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4020 COLBY AVE 2018-01-02 MF Import
>
Address Records
>
COLBY AVE
>
4020
>
4020 COLBY AVE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/2/2020 3:25:24 PM
Creation date
1/27/2017 2:30:05 PM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
4020
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
492
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4c�o Cnlby �lv � , <br /> Name of Project: <br /> � The Everett Clinic Annex . <br /> Constructton S1te Address: � <br /> 4005 Hovt Everett. WA � <br /> Pe��i4tj Referente: . � <br /> � ASSIGNMENT OF FUN�S TO TIIE CITY OF EYERETT � � . <br /> For: (describe improvements) � <br /> Install sidewalk and curb along Hoyt Ave between 40th & 41st Sts and alcng 40th <br /> St 6etween Noyt Ave and Colby Rve <br /> lmproveinents to be instaited per City standards ry 19_ <br /> . We hereby agree tliat the sum of Eight thousand four hundred . <br /> Dollars (E 8,400.00 . � will be held in EscroN Account , <br /> No. in (herelnafter � <br /> referred to as "Bank") whosc address is 14807 Hwy 99 Lynnwood, lJA 98037 <br /> , in the name of The Everett Clinic Annex . <br /> to assure performance of the a6ove-described improvements and guarantee that � <br /> � � these funds will not be released without prior written approval from the � � - <br /> � City of Everett Pub11c Norks Oepartment (hereinafter referred to as <br /> "City"). Ne agree that upon completion of Lhe installation of the . . � , <br /> above-described improvements per City standards and approval by the Cfty, � ' , . <br /> � the City wili provide written notice to the Oank authoriztng the release of -� . . ' <br /> these funds. We further agree Yhat these funds will be released ta the City � - � . <br /> . upon notice by the City that the lmprovements have not been installed per � - <br /> . City standards. . �, � <br /> � ProW ded further, hoNever, that tn the event the above-described � �:�'�. <br /> .I '� . <br /> improvements are lnstalled per City standards and a cerN H cate of parttal <br /> compltance is signed by the City, then in that event, we are further <br /> instructed to release progress pa;ments far the amount of improvements <br /> installed per City standards and approved by the City. The City shall have � ' � <br /> first claim and priority to the remaining balance of said sum <br /> of Eiqht thousand four hundred uollars (S 8 400,00 1• �, �� �"•� <br /> s/oa <br /> . <br />
The URL can be used to link to this page
Your browser does not support the video tag.